Skip to content
InfraWorldWide
Back to the map

Thessaloniki

Greece

Everything built inside Thessaloniki: metro lines, urban bridges and the rest. These projects are shown here rather than on the main map, where at country zoom they would be a few pixels on top of the motorway network.

Population
319,045
Oct 2021
GDP per person
€18,100
2023
Opened
14 km
across 1 project
Under construction
0 km
2 sections in total

The city network

Solid lines are open. Dashed lines are building or planned. Zoom in to reach individual stations.

Loading map data…
Click a line on the map to find it in the list below.

Projects

Sources

Population is the Municipality of Thessaloniki (Dimos Thessalonikis), 319,045 permanent residents at the 2021 census, reference date 22 October 2021. GDP per capita is for NUTS 3 region EL522 Thessaloniki, the whole regional unit, 1,092,919 people at the same census, rural districts included. The GDP figure is therefore spread over about 3.4 times as many people as the population field counts. Eurostat flags the 2023 value as provisional.

Hellenic Statistical Authority (ELSTAT): 2021 Population-Housing Census, permanent population results (index of published tables), ELSTAT, 2021 census, MON_PLI_DHM_OIKISN_2021.xlsx: Permanent population by settlement (Dimos Thessalonikis: 319,045; Periferiaki Enotita Thessalonikis: 1,092,919), Eurostat: Gross domestic product (GDP) at current market prices by NUTS 3 region [nama_10r_3gdp], unit EUR_HAB, geo EL522 Thessaloniki, 2023 (provisional).

Official city site