Projects
Openings timeline
Past openings
- Oct 9, 2026Niš – Brestovac Railway Reconstruction / Niš – Brestovac23 km
- Oct 5, 2026D1 motorway (Bratislava – Žilina – Poprad – Prešov – Košice – Ukrainian border) / Hubová – Ivachnová15 km
- Sep 9, 2026S1 expressway (Pyrzowice – Dąbrowa Górnicza – Mysłowice – Bielsko-Biała – Żywiec – Zwardoń) / Bieruń – Oświęcim (with the Bieruń bypass)3 km
- Aug 31, 2026A7 Motorway (Moldavia Motorway) / Adjud – Bacău Sud46 km
- Aug 31, 2026Danube Corridor (Požarevac – Veliko Gradište – Golubac) / Subsection 2: Bratinac – Veliko Gradište24 km
- Aug 31, 2026Danube Corridor (Požarevac – Veliko Gradište – Golubac) / Ponikve – Radoševac4 km
- Aug 27, 2026Thessaloniki Metro (New Railway Station – Nea Elvetia, Kalamaria extension to Mikra) / Kalamaria extension: Patrikiou junction – Mikra5 km
- Aug 21, 2026D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Ostrov – Vysoké Mýto6 km
- Aug 14, 2026Sofia Metro Line M3 (Gorna Banya – Levski) / Stage 3: Hadzhi Dimitar – Levski (Gen. Vladimir Vazov Blvd)3 km
- Aug 11, 2026A3 Transylvania Motorway (Brașov–Cluj–Borș) / Zimbor – Poarta Sălajului12 km
Scheduled openings
- 2026D11 motorway (Praha – Hradec Králové – Jaroměř – Trutnov – Polish border) / Trutnov – Polish border, 1st stage (1109/I, border section)3 km
- 2026Istrian Y full-profile upgrade (A8 and A9) / A9 Mirna Bridge second carriageway1 km
- 2026Istrian Y full-profile upgrade (A8 and A9) / A9 Limska Draga viaduct second carriageway0.6 km
- 2026S11 expressway, including the Bobolice–Szczecinek section / Bobolice – Szczecinek24 km
- 2026S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek) / Krynice – Dobrzyniewo – Białystok Zachód10 km
- 2026S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek) / Boćki – Malewice – Chlebczyn41 km
- 2026A0 Bucharest Ring Motorway / North half-ring: DN1 – A1 (via Buftea)18 km
- 2026A1 Bucharest–Nădlac Motorway / Tigveni – Curtea de Argeș (section 4)10 km
- 2026A7 Motorway (Moldavia Motorway) / Bacău – Roman (Bacău–Pașcani lot 1)30 km
- 2026A7 Motorway (Moldavia Motorway) / Roman – Săbăoani (Bacău–Pașcani lot 2)19 km
249 projects
- Tunnels · Austria
A 11 Karawanken Tunnel second tube
Opened4 km - Bridges · Austria
A 13 Luegbrücke replacement
Under construction2 km - Highways · Austria
A 26 Linzer Autobahn
OpenedUnder constructionPlanned4 km - Highways · Germany
A 49 Schwalmstadt–Ohmtal triangle
Opened31 km - Highways · Austria
A 5 Nord/Weinviertel Autobahn
Opened53 km - Highways · Spain
A-54 Palas de Rei–Melide
Opened12 km - Highways · Romania
A0 Bucharest Ring Motorway
OpenedUnder construction102 km - Highways · Romania
A1 Bucharest–Nădlac Motorway
OpenedUnder construction568 km - Highways · Poland
A1 motorway (Rusocin – Toruń – Łódź – Częstochowa – Gliwice – Gorzyczki)
Opened561 km - Highways · Slovenia
A1 motorway (Šentilj – Koper)
Opened231 km - Highways · Croatia
A1 Motorway (Zagreb – Ploče)
Opened481 km - Highways · Greece
A1 Motorway Athens – Thessaloniki – Evzonoi (PATHE)
OpenedUnder construction551 km - Highways · Bosnia & Herzegovina
A1 motorway: Medakovo–Ozimice
Under construction22 km - Highways · Serbia
A1 Niš – Preševo (Corridor X south)
Opened146 km - Highways · Bulgaria
A1 Trakia Motorway
Opened355 km - Highways · Romania
A10 motorway (Sebeș–Turda)
Opened70 km - Highways · Romania
A11 Arad–Oradea Motorway
OpenedTendered136 km - Highways · Croatia
A11 Zagreb – Velika Gorica – Lekenik – Sisak
Opened42 km - Highways · Romania
A13 Motorway (Carpathian Motorway)
Under constructionPlanned280 km - Highways · Netherlands
A16 Rotterdam
Opened11 km - Highways · Romania
A2 Bucharest–Constanța Motorway
Opened210 km - Highways · Greece
A2 Egnatia Odos (Igoumenitsa – Kipoi)
Opened642 km - Highways · Bulgaria
A2 Hemus Motorway
OpenedUnder constructionPlanned412 km - Highways · Serbia
A2 Miloš Veliki Motorway (Belgrade – Požega)
Opened152 km - Highways · Slovenia
A2 motorway (Karavanke – Obrežje)
Opened175 km - Highways · Poland
A2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki)
OpenedTenderedPlanned618 km - Highways · Latvia
A2 pavement reconstructions, 2015–2023
Opened31 km - Highways · Greece
A25 Thessaloniki – Serres – Promachonas
Opened93 km - Highways · Greece
A27 Kozani – Ptolemaida – Florina – Niki
Opened15 km - Highways · Greece
A29 Siatista – Kastoria – Krystallopigi
Opened69 km - Highways · Romania
A3 Bucharest–Brașov Motorway
OpenedTendered120 km - Highways · Greece
A3 Central Greece Motorway (E65), Lamia – Egnatia Odos
Opened183 km - Highways · Bulgaria
A3 Struma Motorway
OpenedTenderedUnder construction166 km - Highways · Romania
A3 Transylvania Motorway (Brașov–Cluj–Borș)
OpenedUnder constructionTendered271 km - Highways · France
A355 Strasbourg West Bypass
Opened24 km - Highways · Bulgaria
A4 Maritsa Motorway
Opened101 km - Highways · Romania
A4 motorway (Constanța bypass)
Opened21 km - Highways · Poland
A4 motorway (Jędrzychowice – Wrocław – Katowice – Kraków – Rzeszów – Korczowa)
Opened665 km - Highways · Slovenia
A4 motorway (Slivnica – Gruškovje)
Opened33 km - Highways · Serbia
A4 Niš – Dimitrovgrad (E80)
Opened104 km - Highways · North Macedonia
A4 Skopje–Blace motorway, Phase 2
Under construction11 km - Highways · Latvia
A5 Babīte reconstruction
Opened3 km - Highways · Bulgaria
A5 Cherno More Motorway
Opened11 km - Highways · Greece
A5 Ionia Odos (Antirrio – Ioannina)
OpenedUnder constructionPlanned270 km - Highways · Lithuania
A5 Kaunas–Polish border
Under constructionOpened80 km - Highways · Serbia
A5 Morava Corridor (Pojate – Preljina)
OpenedUnder construction113 km - Highways · Slovenia
A5 motorway (Maribor – Pince)
Opened80 km - Highways · Croatia
A5 Slavonika (Hungarian border – Beli Manastir – Osijek – Đakovo – Sredanci – Svilaj)
Opened90 km - Highways · Greece
A52 Amvrakia Odos (Aktio – Amvrakia)
Opened47 km - Highways · Greece
A6 Attiki Odos
Opened69 km - Highways · Bulgaria
A6 Europe Motorway
Opened65 km - Highways · Romania
A6 Lugoj–Calafat Motorway
OpenedPlanned260 km - Highways · France
A65 Langon–Pau
Opened150 km - Highways · France
A69 Castres–Verfeil
Under construction54 km - Highways · Greece
A7 Moreas Motorway (Corinth – Tripoli – Kalamata) and A71 Lefktro – Sparti
Opened205 km - Highways · Romania
A7 Motorway (Moldavia Motorway)
OpenedUnder constructionTendered454 km - Highways · Croatia
A7 Motorway (Rupa – Rijeka – Žuta Lokva)
OpenedTenderedUnder constructionPlanned99 km - Highways · France
A79 Sazeret–Digoin
Opened88 km - Highways · Greece
A8 Olympia Odos Motorway
Opened277 km - Highways · Latvia
A8 resurfacing, Riga–Jaunolaine
Opened9 km - Highways · Romania
A8 Târgu Mureș–Iași–Ungheni Motorway (Unirii)
Under constructionTendered300 km - Highways · Poland
A8 Wrocław Motorway Bypass
Opened23 km - Bridges · Serbia
Ada Bridge
Opened1 km - Bridges · Romania
Agigea bridges over the Danube–Black Sea Canal
Opened0.6 km - Tunnels · Greece
Aktio – Preveza Undersea Tunnel
Opened2 km - Bridges · Romania
Anghel Saligny Bridge (King Carol I Bridge)
Opened4 km - Railways · Greece
Athens – Thessaloniki railway modernisation (PATHE)
OpenedPlannedUnder construction253 km - Railways · Greece
Athens Airport – SKA – Kiato – Patras railway
OpenedUnder construction240 km - Railways · Greece
Athens Metro Line 2 (Anthoupoli – Elliniko)
Opened18 km - Railways · Greece
Athens Metro Line 3 (Dimotiko Theatro – Doukissis Plakentias)
Opened25 km - Railways · Greece
Athens Metro Line 4, Section A (Alsos Veikou – Goudi)
Under construction13 km - Railways · Greece
Athens Tram
Opened27 km - Highways · Montenegro
Bar–Boljare motorway (A1)
Under constructionOpened65 km - Bridges · Romania
Basarab Overpass, Bucharest
Opened2 km - Railways · Serbia
Belgrade – Novi Sad – Subotica High-Speed Railway
Opened183 km - Highways · Serbia
Belgrade – Zrenjanin – Novi Sad motorway (A6)
Under construction68 km - Highways · Serbia
Belgrade Bypass (A1, E70/E75)
Opened46 km - Railways · Serbia
Belgrade Metro Line 1, Phase 1
Under construction15 km - Highways · Netherlands
Blankenburg Connection (A24)
Opened4 km - Railways · Sweden
Blue Line extension to Barkarby
Under construction4 km - Highways · Greece
BOAK Northern Crete Motorway (Kissamos – Agios Nikolaos)
TenderedUnder construction224 km - Bridges · Romania
Brăila Bridge
Opened2 km - Railways · Romania
Brașov – Sighișoara railway rehabilitation (Corridor IV)
Under construction113 km - Railways · Slovakia
Bratislava Rača – Trnava – Trenčín – Žilina railway modernisation (line 120, 160 km/h)
Opened190 km - Railways · Slovakia
Bratislava western railways: Devínska Nová Ves – Kúty – Czech border and Devínska Nová Ves – Marchegg
Under constructionPlannedOpened59 km - Railways · Austria
Brenner Base Tunnel, Austrian section
Under construction30 km - Railways · Romania
Bucharest – Constanța railway (CFR Line 800) upgrade
Opened225 km - Railways · Romania
Bucharest Metro Line M1 (Dristor 2 – Pantelimon)
Opened32 km - Railways · Romania
Bucharest Metro Line M2 (Pipera – Tudor Arghezi)
OpenedPlanned23 km - Railways · Romania
Bucharest Metro Line M3 (Preciziei – Anghel Saligny)
Opened22 km - Railways · Romania
Bucharest Metro Line M4 (Gara de Nord 2 – Străulești)
OpenedTendered19 km - Railways · Romania
Bucharest Metro Line M5 (Drumul Taberei)
OpenedPlanned16 km - Railways · Romania
Bucharest Metro Line M6 (Gara de Nord – Otopeni Airport)
OpenedUnder construction18 km - Railways · Romania
Bucharest North – Henri Coandă Airport (Otopeni) rail link
Opened3 km - Railways · Romania
București – Jilava – Giurgiu Nord – Giurgiu Nord Frontieră railway modernisation
Under construction64 km - Railways · Romania
Caransebeș – Timișoara – Arad railway modernisation
Under construction162 km - Railways · Poland
Centralna Magistrala Kolejowa (line 4 Grodzisk Mazowiecki – Zawiercie)
Opened229 km - Railways · Romania
CFR Line 300 rehabilitation, Rhine–Danube Corridor (Câmpina–Predeal and Coșlariu–Sighișoara)
Opened148 km - Highways · Greece
Chalkida bypass and Psachna bypass (North–South Evia artery)
Under construction27 km - Railways · Sweden
Citybanan (Stockholm City Line)
Opened6 km - Railways · Romania
Cluj-Napoca – Oradea – Episcopia Bihor railway rehabilitation
Under construction166 km - Railways · Romania
Cluj-Napoca Metro Line M1 (Florești – Cluj-Napoca)
Under construction21 km - Railways · Serbia
Corridor X Railway Modernisation (Belgrade – Niš)
PlannedTendered236 km - Railways · Romania
Craiova – Drobeta-Turnu Severin – Caransebeș railway rehabilitation
Tendered225 km - Highways · Romania
Craiova–Pitești Expressway (DEx12)
Opened118 km - Highways · Czechia
D0 Prague Ring Road (Pražský okruh)
OpenedUnder constructionPlanned81 km - Highways · Slovakia
D1 motorway (Bratislava – Žilina – Poprad – Prešov – Košice – Ukrainian border)
OpenedTenderedPlannedUnder construction516 km - Highways · Czechia
D1 motorway (Praha – Brno – Ostrava – Polish border)
Opened377 km - Highways · Croatia
D10 and DC12 expressways: Sveta Helena – Vrbovec – Križevci and Vrbovec – Bjelovar – Virovitica
OpenedUnder constructionTendered97 km - Highways · Czechia
D11 motorway (Praha – Hradec Králové – Jaroměř – Trutnov – Polish border)
OpenedUnder construction155 km - Highways · Slovakia
D3 motorway (Hričovské Podhradie – Žilina – Čadca – Polish border)
OpenedUnder construction59 km - Highways · Czechia
D3 motorway (Praha – Tábor – České Budějovice – Dolní Dvořiště)
PlannedOpenedUnder construction172 km - Highways · Czechia
D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou)
OpenedUnder constructionTendered171 km - Highways · Czechia
D4 motorway (Praha – Příbram – Písek)
Opened76 km - Highways · Slovakia
D4/R7 Bratislava bypass (D4 Jarovce – Rača, R7 Prievoz – Holice)
Opened59 km - Highways · Czechia
D48 motorway (Bělotín – Nový Jičín – Frýdek-Místek – Žukov)
OpenedUnder construction69 km - Highways · Czechia
D49 motorway (Hulín – Fryšták – Vizovice)
OpenedPlanned35 km - Highways · Czechia
D55 motorway (Olomouc – Přerov – Hulín – Otrokovice – Staré Město – Bzenec – Břeclav)
OpenedTenderedPlanned76 km - Highways · Czechia
D6 motorway (Praha – Karlovy Vary)
OpenedUnder construction99 km - Highways · Czechia
D8 motorway (Praha – Lovosice – Ústí nad Labem – German border)
Opened92 km - Bridges · Serbia
Danube bridge at Bačka Palanka
Tendered3 km - Highways · Serbia
Danube Corridor (Požarevac – Veliko Gradište – Golubac)
OpenedUnder construction66 km - Railways · Romania
Dărmănești – Vicșani – border railway electrification
Under construction30 km - Highways · Romania
DEx16 Oradea Bypass Expressway
Opened12 km - Highways · Romania
DEx6 Danube Expressway (Brăila – Galați)
Under construction12 km - Railways · Slovenia
Divača–Koper second railway track
Under construction27 km - Railways · Croatia
Dugo Selo – Križevci – Koprivnica – Hungarian border railway (M201, second track)
Under construction81 km - Railways · Croatia
Dugo Selo – Novska railway second track (M103)
TenderedOpened100 km - Highways · Finland
E18 Koskenkylä–Kotka motorway
Opened53 km - Highways · Finland
E18 Muurla–Lohja motorway
Opened52 km - Highways · Sweden
E22 Sätaröd–Vä
Opened15 km - Highways · Sweden
E4 Förbifart Stockholm
Under construction21 km - Railways · Poland
E65 Warszawa – Gdynia railway modernisation (line 9)
Opened103 km - Bridges · Greece
Evripos high bridge, Chalkida
Opened0.4 km - Tunnels · Denmark
Fehmarn Belt tunnel
Under construction18 km - Bridges · Romania
Fetești–Cernavodă bridges (A2 / CFR line 800)
Opened3 km - Highways · Romania
Focșani – Brăila Expressway
Tendered74 km - Railways · Norway
Follo Line
Opened22 km - Railways · Romania
Frontieră – Curtici – Simeria railway rehabilitation (Corridor IV)
OpenedUnder construction182 km - Highways · Serbia
Fruška Gora Corridor (Novi Sad – Ruma)
Under constructionTendered45 km - Bridges · Romania
Giurgiu–Ruse Friendship Bridge (Danube Bridge)
Opened2 km - Railways · Sweden
Green Line extension to Arenastaden
Under construction4 km - Railways · Bulgaria
Gyueshevo – North Macedonia border railway
Tendered2 km - Highways · Slovenia
H4 expressway (Razdrto – Vrtojba)
Opened42 km - Railways · Croatia
Hrvatski Leskovac – Karlovac railway (M202, second track)
Under construction44 km - Railways · Netherlands
HSL-Zuid
Opened95 km - Highways · Croatia
Istrian Y (A8 Kanfanar – Matulji, A9 Umag – Pula)
Opened134 km - Highways · Croatia
Istrian Y full-profile upgrade (A8 and A9)
OpenedUnder construction139 km - Highways · Serbia
Iverak – Lajkovac expressway
Opened18 km - Highways · Greece
Kalamata – Rizomylos – Pylos – Methoni road axis
Under construction49 km - Tunnels · Slovenia
Karavanke road tunnel, second tube
Opened4 km - Highways · Latvia
Ķekava bypass (A7)
Opened14 km - Railways · Austria
Koralmbahn Graz–Klagenfurt
Opened125 km - Highways · Serbia
Kuzmin – Sremska Rača motorway with Sava bridge (towards Bijeljina)
Under construction18 km - Railways · Greece
Larissa – Volos railway electrification and signalling
Under construction62 km - Highways · Hungary
M0 Budapest ring road
OpenedPlanned106 km - Highways · Hungary
M1 motorway widening
Under construction78 km - Highways · Hungary
M3 motorway (Budapest – Gödöllő – Hatvan – Füzesabony – Nyíregyháza – Vásárosnamény – Ukrainian border)
OpenedPlanned292 km - Highways · Hungary
M30 motorway: Miskolc–Szikszó
Opened10 km - Highways · Hungary
M35 motorway (Görbeháza – Debrecen – Berettyóújfalu)
Opened68 km - Highways · Hungary
M4 Törökszentmiklós–Kisújszállás
Opened34 km - Highways · Hungary
M44 expressway (Kecskemét – Kunszentmárton – Békéscsaba)
Under constructionOpened126 km - Highways · Hungary
M5 motorway (Budapest – Kecskemét – Szeged – Röszke)
Opened162 km - Highways · Hungary
M6 motorway (Budapest – Dunaújváros – Szekszárd – Bóly – Ivándárda)
Opened194 km - Highways · Hungary
M7 motorway (Budapest – Lake Balaton – Nagykanizsa – Letenye) and M70 spur
Opened247 km - Highways · Hungary
M85 expressway (Győr – Csorna – Sopron – Austrian border)
Opened93 km - Highways · Hungary
M86 expressway (Szombathely – Csorna)
Opened66 km - Railways · Spain
Madrid–Valladolid high-speed railway
Opened179 km - Railways · Austria
Marchegger Ostbahn upgrade and electrification
Opened37 km - Railways · Slovenia
Maribor – Šentilj railway upgrade
Opened18 km - Bridges · Serbia
Mihajlo Pupin Bridge
Opened2 km - Highways · Bulgaria
Montana – Botevgrad Expressway (I-1 / E79)
OpenedPlannedUnder construction99 km - Bridges · Romania
New Europe Bridge (Vidin–Calafat)
Opened2 km - Railways · Denmark
New Railway across Vestfyn
Under construction35 km - Railways · Austria
New West Railway Wien–St. Pölten
Opened60 km - Railways · Serbia
Niš – Brestovac Railway Reconstruction
Opened23 km - Railways · Serbia
Niš – Dimitrovgrad Railway Modernisation
Under construction96 km - Railways · Sweden
Norrbotniabanan (North Bothnia Line)
Under construction130 km - Bridges · Serbia
Novi Sad bypass with Danube bridge (state road IIA-111)
Under construction2 km - Highways · Romania
Oar – Satu Mare Expressway (Someș Expres)
Tendered11 km - Railways · Greece
Palaiofarsalos – Kalambaka railway: electrification and signalling
Under construction80 km - Bridges · Croatia
Pelješac Bridge and access roads
Opened22 km - Railways · Bulgaria
Pernik – Radomir railway modernisation
Tendered15 km - Railways · Bulgaria
Plovdiv – Burgas railway rehabilitation, Phase 2
OpenedUnder construction63 km - Railways · Bulgaria
Plovdiv railway node modernisation
Under construction23 km - Highways · Montenegro
Podgorica Western Bypass
Tendered3 km - Railways · Poland
Podłęże – Piekiełko new line and line 104 Chabówka – Nowy Sącz rebuild
OpenedUnder constructionTendered115 km - Railways · Austria
Pottendorfer Linie upgrade
Opened52 km - Railways · Slovenia
Pragersko – Hodoš railway modernisation
Opened109 km - Railways · Czechia
Prague Metro Line D (Náměstí Míru – Depo Písnice)
Under constructionPlanned11 km - Railways · Czechia
Praha – Benešov – Tábor – České Budějovice railway (4th transit corridor, lines 221/220)
OpenedPlanned157 km - Highways · Slovakia
R1 expressway (Trnava – Nitra – Žiar nad Hronom – Zvolen – Banská Bystrica)
OpenedUnder construction174 km - Highways · Slovakia
R2 expressway (Trenčín – Prievidza – Zvolen – Lučenec – Rimavská Sobota – Rožňava – Košice)
OpenedTendered113 km - Highways · Slovakia
R3 expressway (Orava and Turiec sections)
Opened22 km - Highways · Slovakia
R4 expressway (Košice – Prešov – Svidník – Polish border)
OpenedUnder construction33 km - Railways · Finland
Raide-Jokeri light rail, line 15
Opened25 km - Railways · Poland
Rail Baltica in Poland: Warszawa Rembertów – Sadowne – Czyżew – Białystok – Ełk (lines 449, 6 and 38, E75)
OpenedUnder constructionTendered271 km - Railways · Poland
Railway line 201 Kościerzyna – Somonino – Gdynia Główna (modernisation, electrification and second track) and Pomorska Kolej Metropolitalna line 248
Under constructionTenderedOpened89 km - Railways · Poland
Railway line 202 Gdynia Chylonia – Słupsk (modernisation)
TenderedUnder construction110 km - Railways · Poland
Railway line 8 Warszawa – Radom – Kielce – Kraków (modernisation)
OpenedTenderedUnder construction193 km - Railways · Kosovo
Railway Route 10 rehabilitation
Under construction101 km - Bridges · Greece
Rio – Antirrio Bridge (Charilaos Trikoupis Bridge)
Opened3 km - Tunnels · Romania
Romanian railway tunnels
OpenedUnder constructionTendered20 km - Tunnels · Romania
Romanian road tunnels
OpenedTenderedUnder construction11 km - Highways · Serbia
Ruma – Šabac – Loznica Motorway and Expressway
Opened78 km - Highways · Bulgaria
Ruse – Veliko Tarnovo Motorway
TenderedUnder constructionPlanned133 km - Highways · Austria
S 1 Wiener Außenring Schnellstraße
OpenedPlanned59 km - Highways · Austria
S 10 Mühlviertler Schnellstraße
OpenedUnder constructionPlanned38 km - Highways · Poland
S1 expressway (Pyrzowice – Dąbrowa Górnicza – Mysłowice – Bielsko-Biała – Żywiec – Zwardoń)
OpenedUnder construction132 km - Highways · Poland
S10 expressway (Szczecin – Stargard – Wałcz – Piła – Bydgoszcz – Toruń – Płońsk)
Under constructionOpenedTendered267 km - Highways · Poland
S11 expressway, including the Bobolice–Szczecinek section
Under construction24 km - Highways · Poland
S17 expressway (Warszawa – Garwolin – Lublin – Zamość – Hrebenne)
OpenedTenderedUnder construction307 km - Highways · Poland
S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek)
OpenedTenderedUnder constructionPlanned557 km - Highways · Poland
S2 expressway (Południowa Obwodnica Warszawy: Konotopa – Puławska – Lubelska)
Opened32 km - Highways · Poland
S3 expressway (Świnoujście – Szczecin – Zielona Góra – Legnica – Lubawka)
OpenedTendered458 km - Highways · Poland
S5 expressway (Nowe Marzy – Bydgoszcz – Gniezno – Poznań – Wrocław)
Opened346 km - Highways · Poland
S6 expressway (Goleniów – Koszalin – Słupsk – Gdynia, Trasa Kaszubska)
TenderedOpened361 km - Highways · Poland
S61 expressway Via Baltica (Ostrów Mazowiecka – Łomża – Ełk – Suwałki – Budzisko)
Opened215 km - Highways · Poland
S7 expressway (Gdańsk – Elbląg – Warszawa – Radom – Kielce – Kraków – Rabka)
OpenedUnder construction598 km - Highways · Poland
S8 expressway (Wrocław – Łódź – Warszawa – Białystok)
Opened532 km - Bridges · Latvia
Salaca bridge reconstruction
Opened0.2 km - Tunnels · Austria
Semmering Base Tunnel
Under construction27 km - Railways · Bulgaria
Sofia – Dragoman railway modernisation
Under construction43 km - Railways · Bulgaria
Sofia – Plovdiv railway modernisation
Under constructionOpened152 km - Railways · Bulgaria
Sofia Metro Line M1 (Slivnitsa – Business Park Sofia)
Opened19 km - Railways · Bulgaria
Sofia Metro Line M2 (Obelya – Vitosha)
Opened12 km - Railways · Bulgaria
Sofia Metro Line M3 (Gorna Banya – Levski)
OpenedUnder construction21 km - Railways · Bulgaria
Sofia Metro Line M4 (Obelya – Sofia Airport)
Opened24 km - Railways · Serbia
Subotica – Horgoš – Hungarian Border Railway
Opened28 km - Bridges · Croatia
Svilaj Bridge over the Sava (A5, Croatia – Bosnia and Herzegovina)
Opened0.7 km - Tunnels · Poland
Świna Tunnel (Świnoujście)
Opened2 km - Railways · Greece
Thessaloniki – Idomeni railway
Under construction73 km - Highways · Greece
Thessaloniki Flyover (Eastern Inner Ring Road upgrade, K5 – K12)
Under construction13 km - Railways · Greece
Thessaloniki Metro (New Railway Station – Nea Elvetia, Kalamaria extension to Mikra)
Opened14 km - Highways · Slovenia
Third Development Axis North (Velenje – Slovenj Gradec)
Under construction18 km - Highways · Albania
Thumanë–Kashar motorway
Opened21 km - Bridges · Romania
Ungheni road bridges over the Prut
Under construction1 km - Railways · Sweden
Västlänken (West Link)
Under construction7 km - Highways · Bulgaria
Vidin – Montana Motorway
Under constructionOpenedTendered95 km - Railways · Bulgaria
Vidin – Sofia railway modernisation: Medkovets – Sratsimir
Tendered44 km - Railways · Croatia
Vinkovci – Vukovar and Vinkovci – Tovarnik railway upgrades
Opened52 km - Highways · Finland
Vt 4 Kirri–Vehniä motorway
Opened16 km - Railways · Germany
Wendlingen–Ulm high-speed railway
Opened60 km - Railways · Sweden
Yellow Line to Älvsjö
Under construction8 km - Railways · Croatia
Zaprešić – Zabok railway modernisation and electrification (R201)
OpenedTendered35 km - Railways · Serbia
Zemun Polje – Nikola Tesla Airport – National Stadium railway
Under construction18 km - Bridges · Serbia
Žeželj Bridge, Novi Sad
Opened0.5 km - Railways · Slovakia
Žilina – Čadca – Czech border railway modernisation (line 106D, corridor VI)
Opened25 km - Railways · Slovakia
Žilina – Košice railway modernisation (160 km/h)
OpenedUnder constructionTendered31 km