Skip to content
InfraWorldWide
← All projects
Bridges

Giurgiu–Ruse Friendship Bridge (Danube Bridge)

Steel truss bridge over the Danube between Giurgiu (Romania) and Ruse (Bulgaria), opened in 1954 as the Friendship Bridge with aid from the Soviet Union. A double-deck road-rail bridge, it was the only bridge over the Danube shared by Romania and Bulgaria until the New Europe Bridge opened in 2013.

Total length
2 km
Open today
2 km
Sections
1
Loading map data…

Sections

Sections of Giurgiu–Ruse Friendship Bridge (Danube Bridge): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Main bridge

Double-deck road-rail bridge designed by Soviet engineers V. Andreev and N. Rudomazin, built 1952–1954 with Soviet aid

Opened2 km
  1. 1952Construction start
  2. Jun 20, 1954Opened
–
  • OtherConstructed with aid from the Soviet Union
  • V. AndreevDesigner
  • N. RudomazinDesigner
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • Other2 km
    1 section
    • Constructed with aid from the Soviet Union

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. Wikipedia: Danube Bridge
  2. Valahia (Jurnal Giurgiuvean): Podul „Dunărea” – Diploma şi insigna inaugurării (3 November 2010, archived)read Sep 25, 2026
  3. Jurnalul Național: „Most na drujbata”, podul prieteniei (21 October 2006)read Sep 25, 2026