Bridges

New Europe Bridge (Vidin–Calafat)

Extradosed road-rail bridge over the Danube between Calafat (Romania) and Vidin (Bulgaria), also known as Danube Bridge 2. The second bridge on the shared Romanian–Bulgarian section of the Danube, it carries four road lanes, one railway track and a bicycle/pedestrian path, and is part of Pan-European Corridor IV and European route E79. Built by the Spanish company FCC Construcción.

Total length
2 km
Open today
2 km
Sections
1
Cost on record
€188.448M
1 of 1 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of New Europe Bridge (Vidin–Calafat): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Main bridge

Combined road-rail bridge Vidin–Calafat; builder FCC Construcción, designer Fernández Casado; ISPA/PHARE support plus a €50M EIB credit (December 2000)

Opened2 km
  1. Jan 30, 2007Tender awarded
  2. May 13, 2007Construction start
  3. Jun 14, 2013Opened
  • Estimated €99M(2000)
  • Actual €145.46M(2013)
  • European UnionCo-financed through the EU ISPA pre-accession instrument; design study financed by the PHARE programme
  • LoanEuropean Investment Bank credit loan of €50 million granted in December 2000
  • FCC ConstrucciónBuilder
  • Fernández CasadoDesigner
38 mo total · Contract value €99.956M

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • European Union2 km
    1 section
    • Co-financed through the EU ISPA pre-accession instrument; design study financed by the PHARE programme
  • Loan2 km
    1 section
    • European Investment Bank credit loan of €50 million granted in December 2000

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Corridors

The designations this project is recorded under. Both schemes are kept: the Pan-European corridors are how these projects were described when they were planned, and TEN-T is what EU money is allocated on today.

  • Pan-European Corridor IVPan-European

Sources

  1. Wikipedia: New Europe Bridge
  2. bta.bg (dates.tenderAwarded)
  3. web.archive.org (cost.actual)