Basarab Overpass, Bucharest

Road, tram and pedestrian overpass of 1,920 m closing the inner ring of Bucharest between Nicolae Titulescu Boulevard and Grozăvești Road. It crosses the Dâmbovița river and the throat of Gara de Nord. The cable-stayed section, designed by Javier Manterola and carried on two pylons of about 84 m with 60 cables, is 44.5 m wide, the widest cable-stayed bridge in Europe. Astaldi and FCC Construcción built it between September 2006 and June 2011 at a cost of about €255 million; it carries around 50,000 vehicles a day and Bucharest's only circular tram line.

Total length
2 km
Open today
2 km
Sections
1
Cost on record
€343.208M
1 of 1 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of Basarab Overpass, Bucharest: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Nicolae Titulescu – Grozăvești overpass

Built 2006–2011 by Astaldi and FCC Construcción for about €255 million; officially inaugurated 17 June 2011 and opened to traffic on 19 June 2011. The order to start works was issued in September 2006; after site setup, works effectively began in early 2007.

Opened2 km
  1. Jul 10, 2006Tender awarded
  2. Sep 2006Construction start
  3. Jun 19, 2011Opened
  • Actual €255M(2011)
  • OtherBucharest municipality
  • Astaldi SpABuilder
  • FCC Construcción SABuilder
  • Javier ManterolaDesigner
28 mo execution · Contract value lei 471.634M

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • Other2 km
    1 section
    • Bucharest municipality

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. Wikipedia: Basarab Overpass
  2. OpenStreetMap contributors (geometry, ODbL)
  3. cotidianul.ro (citing B365.ro): Cât costă, de fapt, Pasajul Basarab (2011-04-05)read Sep 25, 2026