Frontieră – Curtici – Simeria railway rehabilitation (Corridor IV)
Rehabilitation of the double-track main line from the Hungarian border at Curtici through Arad and Radna to Simeria, the western part of the Romanian branch of Pan-European Corridor IV, for 160 km/h passenger and 120 km/h freight traffic with ERTMS/ETCS Level 2 signalling. Section 1 (border–Curtici–Arad–km 614, 41.185 km) was completed in 2016. Sections 2 (km 614–Gurasada) and 3 (Gurasada–Simeria) received RON 9.5 billion (about €2 billion) of financing, 75% of it from the Cohesion Fund, and are still in execution; they aim to cut the Arad–Simeria journey from 146 to 74 minutes.
- Total length
- 182 km
- Open today
- 41 km
- Under construction
- 41 km
- Sections
- 3
- Cost on record
- €357.181M
- 1 of 3 sections carry a comparable figure
Restated into EUR at 2025 prices.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Section 1: Border – Curtici – Arad – km 614 Contract signed on 15 February 2012 for the 41.185 km double-track section; execution ran into delays and finished around January 2016, when the new traffic-control system entered service | Opened | 41 km |
|
|
|
| 27 mo execution · Contract value lei 1.1B |
| Section 2: km 614 – Gurasada Split into subsections 2A and 2B (about 80 km with 11 stations, 30 bridges and one tunnel) and Cap Y Bârzava – Cap Y Ilteu; sections 2 and 3 together were financed with RON 9.5 billion (~€2bn), RON 6bn from the Cohesion Fund | Under construction | 100 km | – | – |
|
| – |
| Section 3: Gurasada – Simeria Contract signed with the FCC–Astaldi–Convensa consortium on 31 August 2017 for 41 km of line, 17 bridges, 27 culverts, 4 overpasses, 3 underpasses and 4 stations; works started in early 2018, originally due in 2021, now expected in November 2026 | Under construction | 41 km |
| – |
|
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- European Union182 km3 sections
- Cohesion Fund
- Cohesion Fund (75% of eligible costs of sections 2 and 3)
- National budget182 km3 sections
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- HighwaysA1 Bucharest–Nădlac MotorwaySame contractor: Astaldi, FCC Construcción
- HighwaysA4 motorway (Constanța bypass)Same contractor: Astaldi, FCC Construcción
- BridgesBasarab Overpass, BucharestSame contractor: Astaldi, FCC Construcción
- RailwaysBucharest Metro Line M5 (Drumul Taberei)Same contractor: Astaldi, FCC Construcción
- RailwaysBrașov – Sighișoara railway rehabilitation (Corridor IV)Same contractor: Alstom, Euro Construct Trading '98
- TunnelsRomanian railway tunnelsSame contractor: Alstom, Euro Construct Trading '98
Corridors
The designations this project is recorded under. Both schemes are kept: the Pan-European corridors are how these projects were described when they were planned, and TEN-T is what EU money is allocated on today.
- Pan-European Corridor IVPan-European
Sources
- CFR SA: Reabilitarea liniei de cale ferată Frontieră – Curtici – Simeria (Tronson 1)
- Railway PRO: Km 614–Gurasada and Gurasada–Simeria rail sections receive EUR 2 billion financing
- Hill International: Gurasada–Simeria railway section
- Webuild: Frontiera–Curtici–Simeria railway line
- OpenStreetMap contributors (geometry of CFR line 200, ODbL)
- romania-insider.com
- zf.ro