← All projects
Bridges
Anghel Saligny Bridge (King Carol I Bridge)
Historic railway truss bridge complex across the Danube and its Borcea branch between Cernavodă and Fetești, designed by Romanian engineer Anghel Saligny and inaugurated in 1895. At completion it was the longest bridge in Europe and the second longest in the world. It links Muntenia with Dobruja and is listed in the National Register of Historic Monuments.
- Total length
- 4 km
- Open today
- 4 km
- Sections
- 1
Category
Bridges
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Bridge complex over the Danube, Balta Ialomiței island and the Borcea branch Railway bridge complex over the Danube designed by Anghel Saligny, built 1890–1895; longest bridge in Europe at completion. The total cost of the works, 35 million gold lei, covered the whole Fetești–Cernavodă line including its track and stations, not the bridges alone. | Opened | 4 km |
| – | – |
| 60 mo execution |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Related projects
- BridgesFetești–Cernavodă bridges (A2 / CFR line 800)Same country and category
- BridgesAgigea bridges over the Danube–Black Sea CanalSame country and category
- BridgesBasarab Overpass, BucharestSame country and category
- BridgesBrăila BridgeSame country and category
- BridgesGiurgiu–Ruse Friendship Bridge (Danube Bridge)Same country and category
- BridgesNew Europe Bridge (Vidin–Calafat)Same country and category