Fetești–Cernavodă bridges (A2 / CFR line 800)
Pair of combined road-and-rail bridges carrying the A2 motorway and the double-track Bucharest–Constanța railway over the Borcea branch and the Danube between Fetești and Cernavodă, built alongside Anghel Saligny's 1895 crossing. Designed by IPTANA București under engineer Vasile Cănuță and built by CCCF București, they were inaugurated on 21 November 1987 together with the first, 17 km section of the A2. More than 300 structural cracks found in 2014 forced a long closure; the rehabilitation was accepted on 12 July 2018. The Cernavodă bridge carries the only remaining toll on the Romanian motorway network.
- Total length
- 3 km
- Open today
- 3 km
- Sections
- 2
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Borcea branch bridge (Fetești) 982.5 m road deck (972 m for the railway); opened in May 1987 and officially inaugurated with the Cernavodă bridge on 21 November 1987. Rehabilitated after the 2014 crack findings, final acceptance 12 July 2018 (Arcada Company, Metabet CF, Railway Construction Company) | Opened | 1 km |
| – |
|
| – |
| Danube bridge at Cernavodă 1,638.91 m over 21 spans, main span 190 m flanked by two 140 m spans, deck 32.5 m wide; in service from October 1987, inaugurated 21 November 1987, rehabilitated by July 2018 | Opened | 2 km |
| – |
|
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- National budget3 km2 sections
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- HighwaysA2 Bucharest–Constanța MotorwaySame contractor: CCCF București, IPTANA
- HighwaysA1 Bucharest–Nădlac MotorwaySame contractor: IPTANA
- BridgesAgigea bridges over the Danube–Black Sea CanalSame country and category
- BridgesAnghel Saligny Bridge (King Carol I Bridge)Same country and category
- BridgesBasarab Overpass, BucharestSame country and category
- BridgesBrăila BridgeSame country and category