Agigea bridges over the Danube–Black Sea Canal
Two cable-stayed road bridges over the Danube–Black Sea Canal at its Agigea end, on the road link between Constanța, its southern port and the seaside resorts. The 1983 bridge, designed by a team led by engineer Octavian Strâmbu, was the first cable-stayed bridge on a Romanian national road: 290 m long, with a 162.5 m span over the navigable channel. A second, larger cable-stayed bridge, 360 m long with a 200 m central span, was built at km 0+540 and inaugurated on 19 October 2015 to relieve the original crossing.
- Total length
- 0.6 km
- Open today
- 0.6 km
- Sections
- 2
- Cost on record
- €60.883M
- 1 of 2 sections carry a comparable figure
Restated into EUR at 2025 prices.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Old Agigea bridge (DN39) 290 m long, of which a 246.65 m cable-stayed structure with a 162.5 m main span over the navigable channel; built from 1980 with floating cranes and self-compacting concrete, inaugurated 19 June 1983 as Romania's first cable-stayed bridge on a national road (OpenStreetMap records the opening as 1984) | Opened | 0.3 km |
| – |
|
| – |
| New Agigea bridge (km 0+540) Cable-stayed bridge 360 m long, 200 m central span, 17.4 m wide, at km 0+540 of the canal; the financing contract for the bridge and its access works to Constanța port was 191,797,112 lei. Inaugurated 19 October 2015 after a delay of nearly ten months, with press reporting that unrestricted traffic followed only later | Opened | 0.4 km |
|
|
|
| Contract value lei 191.8M |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- National budget0.6 km2 sections
- European Union0.4 km1 section
- Sectoral Operational Programme Transport (POS-T) 2007–2013, financing contract no. 18 of 11 September 2009: 85% EU structural funds, 15% state budget.
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- BridgesFetești–Cernavodă bridges (A2 / CFR line 800)Same country and category
- BridgesAnghel Saligny Bridge (King Carol I Bridge)Same country and category
- BridgesBasarab Overpass, BucharestSame country and category
- BridgesBrăila BridgeSame country and category
- BridgesGiurgiu–Ruse Friendship Bridge (Danube Bridge)Same country and category
- BridgesNew Europe Bridge (Vidin–Calafat)Same country and category
Sources
- Rador: Podul rutier de la Agigea, o minune inginerească a României
- Adevărul: Noul pod de la Agigea, cel mai mare pod hobanat din România
- ZIUA de Constanța: 18 octombrie, prima adunare a creditorilor: Firma care a construit noul pod de la Agigea, Apolodor Com Impex, nu scapă de falimentread Sep 28, 2026
- CN Administrația Porturilor Maritime Constanța: Proiecte (archived 21 March 2016)read Oct 1, 2026 · archived copy
- OpenStreetMap contributors (geometry, ODbL)