← All projects
Bridges
Brăila Bridge
Suspension bridge over the Danube at Brăila, the longest in Romania and third longest in the EU by main span (1,120 m). Connects Brăila to the opposite bank towards Tulcea, ending the dependence on ferry crossings.
- Total length
- 2 km
- Open today
- 2 km
- Sections
- 1
- Cost on record
- €522.737M
- 1 of 1 sections carry a comparable figure
Restated into EUR at 2025 prices.
Category
Bridges
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Main bridge and access roads Suspension bridge over the Danube; built by Webuild (Astaldi) with IHI Infrastructure Systems, EU and national budget financed | Opened | 2 km |
|
|
|
| 36 mo execution · 48 mo total |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- European Union2 km1 section
- National budget2 km1 section
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- HighwaysA2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki)Same contractor: Astaldi
- HighwaysS2 expressway (Południowa Obwodnica Warszawy: Konotopa – Puławska – Lubelska)Same contractor: Astaldi
- HighwaysS7 expressway (Gdańsk – Elbląg – Warszawa – Radom – Kielce – Kraków – Rabka)Same contractor: Astaldi
- HighwaysS8 expressway (Wrocław – Łódź – Warszawa – Białystok)Same contractor: Astaldi
- HighwaysA1 Bucharest–Nădlac MotorwaySame contractor: Astaldi
- HighwaysA2 Bucharest–Constanța MotorwaySame contractor: Astaldi