A2 Bucharest–Constanța Motorway
The "Motorway of the Sun" (Autostrada Soarelui) linking Bucharest to the Black Sea port of Constanța, 206 km. The Cernavodă bridges section dates from 1987; the motorway was completed end-to-end in November 2012.
- Total length
- 210 km
- Open today
- 210 km
- Sections
- 8
- Cost on record
- €170.544M
- 1 of 8 sections carry a comparable figure
Restated into EUR at 2025 prices.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Bucharest – Fundulea Bucharest–Fetești sector built 2001–2007 in four sections; this one by the Romanian company Romis, surfaced with concrete slabs | Opened | 27 km |
|
|
|
| Contract value €73.8M |
| Fundulea – Lehliu Bucharest–Fetești sector, section 2, built by the Turkish joint venture Yuksel–Makimsan–Ener | Opened | 29 km |
|
|
|
| Contract value €87.068M |
| Lehliu – Drajna Bucharest–Fetești sector, section 3, built by the French company Colas | Opened | 42 km |
|
|
|
| Contract value €116.826M |
| Drajna – Fetești Bucharest–Fetești sector, section 4, built by the Astaldi–Max Bögl–CCCF joint venture with ISPA pre-accession support | Opened | 37 km |
|
|
|
| 6 mo design · 18 mo execution · 24 mo total · 48 mo guarantee · Contract value €64.549M |
| Fetești – Cernavodă (Danube bridges) Oldest section: the Cernavodă bridge complex over the Danube, opened 21 November 1987; closed September 2006 for complete rebuilding and reopened 2007 | Opened | 17 km |
| – |
|
| – |
| Cernavodă – Medgidia Part of the Cernavodă–Constanța section, total cost €413.95M: €250M European Investment Bank loan, €70.81M European Commission, ~€90M Romanian state. Works began in 2009 under an earlier contract; the contract signed on 21 September 2011 re-awarded the remaining works. | Opened | 21 km |
|
|
|
| 3 mo design · 12 mo execution · 15 mo total · 48 mo guarantee · Contract value lei 498.8M |
| Medgidia – Murfatlar Part of the Cernavodă–Constanța section, total cost €413.95M: €250M European Investment Bank loan, €70.81M European Commission, ~€90M Romanian state | Opened | 16 km |
| – |
|
| 6 mo design · 18 mo execution · 24 mo total · 48 mo guarantee · Contract value lei 596.054M |
| Murfatlar – Constanța Part of the Cernavodă–Constanța section, total cost €413.95M: €250M European Investment Bank loan, €70.81M European Commission, ~€90M Romanian state | Opened | 21 km |
| – |
|
| 6 mo design · 18 mo execution · 24 mo total · 48 mo guarantee · Contract value lei 596.054M |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- Loan156 km6 sections
- European Investment Bank: €250M of the €413.95M Cernavodă–Constanța cost
- National budget112 km5 sections
- European Union95 km4 sections
- ISPA pre-accession funds
- Cohesion Fund / European Commission: €70.81M of the €413.95M Cernavodă–Constanța cost
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- HighwaysA1 Bucharest–Nădlac MotorwaySame contractor: Astaldi, Astaldi – Max Bögl, IPTANA, Max Bögl
- HighwaysA2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki)Same contractor: Astaldi, Max Bögl
- BridgesFetești–Cernavodă bridges (A2 / CFR line 800)Same contractor: CCCF București, IPTANA
- HighwaysA3 Transylvania Motorway (Brașov–Cluj–Borș)Same contractor: Astaldi, Max Bögl
- RailwaysBucharest Metro Line M5 (Drumul Taberei)Same contractor: Astaldi, Max Bögl
- HighwaysD0 Prague Ring Road (Pražský okruh)Same contractor: Max Bögl
Sources
- Wikipedia: A2 motorway (Romania)
- OpenStreetMap contributors (geometry, ODbL)read Aug 14, 2026
- businesscover.ro
- ro.wikipedia.org
- mediafax.ro
- Wikipedia (ro): Autostrada A2 (România)#Costuri
- Jurnalul Național: Autostrada Soarelui – zero kilometri în doi ani (2009-07-09)read Sep 25, 2026
- CNADNR: Construcția autostrăzii Cernavodă – Constanța (archived 2013)read Sep 25, 2026
- HotNews: CNADNR a semnat cu Astaldi contractul pentru tronsonul Cernavodă – Medgidia (2011-09-21)read Sep 25, 2026
- Newsweek România: Astaldi despăgubită cu 265 milioane de leiread Sep 25, 2026
- HotNews: CNADNR a lăsat tronsonul de autostradă Cernavodă-Medgidia fără constructor (2011-04-11)read Sep 28, 2026 · archived copy
- HotNews: Tronsonul Drajna-Fetesti al Autostrazii Soarelui, finalizat de 1 Mai (2007-04-30)read Sep 28, 2026
- CNADNR: Proiecte ISPA, secțiunile 4 și 5 ale autostrăzii București – Constanța (archived 2013)read Sep 28, 2026