← All projects
Highways
A-54 Palas de Rei–Melide
The A-54 section between Palas de Rei and Melide in Galicia.
- Total length
- 12 km
- Open today
- 12 km
- Sections
- 1
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Palas de Rei–Melide The ministry reports 11.67 km. The OSM line follows one carriageway from the Palas de Rei junction to the construction boundary near Melide and measures about 12.1 km. | Opened | 12 km |
| – | – |
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Related projects
- HighwaysA2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki)Same contractor: Acciona
- HighwaysA4 motorway (Jędrzychowice – Wrocław – Katowice – Kraków – Rzeszów – Korczowa)Same contractor: Acciona
- HighwaysS19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek)Same contractor: Acciona
Sources
- Ministerio de Transportes: A-54 Palas de Rei–Melide section openedread Oct 11, 2026
- Revista del Ministerio de Transportes, n.º 756 (marzo de 2025)read Oct 12, 2026
- OpenStreetMap: A-54 route relation 4051452read Oct 11, 2026