Railways

Gyueshevo – North Macedonia border railway

Design and construction of the missing 2.4 km of railway from Gyueshevo to the border with North Macedonia, with reconstruction of the station tracks and building at Gyueshevo. Part of Corridor VIII. On 22 December 2025 the National Railway Infrastructure Company ranked DZZD GYUESHEVO 2025 first at BGN 97.97 million excluding VAT, with completion by the end of 2028.

Total length
2 km
Open today
0 km
Sections
1
Loading map data…

Sections

Sections of Gyueshevo – North Macedonia border railway: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Gyueshevo – border with North Macedonia

NRIC closed the contractor selection on 22 December 2025: DZZD GYUESHEVO 2025 ranked first at BGN 97,972,691.73 excluding VAT. The scope covers design and construction of the missing 2.4 km to the border and reconstruction of the track layout and station building at Gyueshevo; the deadline is the end of 2028. No contract signing was found, so the lot stays tendered and the price is recorded as a bid. The geometry follows the way mapped in OpenStreetMap as proposed railway from Gyueshevo station to the border, about 2.2 km, including a proposed tunnel; NRIC does not state the tunnel.

Tendered2 km
  1. Dec 2028Expected opening
  • Estimated лв97.97MContract price of the first-ranked bidder, excluding VAT. Not a signed contract.
–––

Related projects

Corridors

The designations this project is recorded under. Both schemes are kept: the Pan-European corridors are how these projects were described when they were planned, and TEN-T is what EU money is allocated on today.

  • Pan-European Corridor VIIIPan-European

Sources

  1. NRIC: НКЖИ приключи процедурите за избор на изпълнител по два проекта от Коридор VIII (22.12.2025)read Oct 5, 2026
  2. OpenStreetMap contributors (geometry, ODbL)read Oct 5, 2026