Plovdiv – Burgas railway rehabilitation, Phase 2

Phase 2 of the rehabilitation of railway line 8 between Plovdiv and Burgas, run by the National Railway Infrastructure Company (NRIC). The project is worth BGN 810.02 million, of which BGN 563.16 million is EU grant, and covers track renewal at Skutare – Orizovo, the new double-track Orizovo – Mihaylovo section with the Chirpan tunnel, works at Yambol – Zimnitsa and Straldzha – Tserkovski, signalling and ETCS, and the replacement of level crossings. Only the sections with a recorded extent and contractor are drawn here.

Total length
63 km
Open today
28 km
Sections
2
Loading map data…

Sections

Sections of Plovdiv – Burgas railway rehabilitation, Phase 2: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Skutare – Orizovo

Track renewal, bridge reconstruction, new catenary and signalling in stations, including Manole, Belozem and Opalchenets, for 90–130 km/h. Contract value BGN 63,498,462 excluding VAT. The opening date is that of the NRIC ribbon-cutting ceremony. Length measured from OpenStreetMap geometry (Skutare to Orizovo station).

Opened28 km
  1. Jul 28, 2020Opened
–
  • European UnionPhase 2 is co-financed by the Cohesion Fund through the Transport and Transport Infrastructure operational programme 2014–2020.
  • Обединение „Европейски железници“Builder
Contract value лв63.5M
Orizovo – Mihaylovo (double track, Chirpan tunnel)

The single-track line with five intermediate stations becomes a double-track line with three stations (Orizovo, Chirpan, Mihaylovo) for 160 km/h, without level crossings, mostly on a new alignment. On 4 November 2025 NRIC reported 23.5 km of new track in service and 9.5 km still to come (33.0 km of new track in all). The 744 m Chirpan tunnel, bypassing Chirpan station, was fully excavated, with finishing works to follow; the NRIC project page gives 835 m. Contract value BGN 217,982,167 excluding VAT. Length measured from OpenStreetMap geometry (Orizovo to Mihaylovo station, via the new Chirpan tunnel alignment).

Under construction36 km––
  • European UnionCohesion Fund through the Transport and Transport Infrastructure programme 2014–2020 and the Transport Connectivity programme 2021–2027.
  • ДЗЗД „Евро жп инфраструктура“ („Инфраструктурно строителство“ АД, „Марко Обра Публика“ АД)Builder
Contract value лв217.98M

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • European Union63 km
    2 sections
    • Phase 2 is co-financed by the Cohesion Fund through the Transport and Transport Infrastructure operational programme 2014–2020.
    • Cohesion Fund through the Transport and Transport Infrastructure programme 2014–2020 and the Transport Connectivity programme 2021–2027.

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. NRIC: Завърши прокопаването на тунела край Чирпан – ключово съоръжение по железопътната линия Пловдив–Бургас (4 Nov 2025)read Oct 5, 2026
  2. NRIC: Рехабилитация на железопътната линия Пловдив – Бургас, Фаза 2read Oct 5, 2026