Pernik – Radomir railway modernisation

Modernisation of the Pernik – Radomir section of the Sofia – Pernik – Radomir railway, part of Corridor VIII. The project provides a double line for speeds up to 160 km/h, renewal of station tracks and removal of all level crossings. On 22 December 2025 the National Railway Infrastructure Company ranked DZZD ISPA first at BGN 421.28 million excluding VAT, with completion by mid-2029.

Total length
15 km
Open today
0 km
Sections
1
Loading map data…

Sections

Sections of Pernik – Radomir railway modernisation: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Pernik – Radomir

NRIC closed the contractor selection on 22 December 2025: DZZD ISPA ranked first at BGN 421,283,219 excluding VAT. The scope is a double line for up to 160 km/h, renewal of station tracks and removal of all level crossings; the deadline is mid-2029. No contract signing was found, so the lot stays tendered and the price is recorded as a bid. Length measured from OpenStreetMap geometry (existing single track between Pernik and Radomir stations); no length is stated in the NRIC release. No new alignment is mapped in OpenStreetMap.

Tendered15 km
  1. Jun 2029Expected opening
  • Estimated лв421.28MContract price of the first-ranked bidder, excluding VAT. Not a signed contract.
–––

Related projects

Corridors

The designations this project is recorded under. Both schemes are kept: the Pan-European corridors are how these projects were described when they were planned, and TEN-T is what EU money is allocated on today.

  • Pan-European Corridor VIIIPan-European

Sources

  1. NRIC: НКЖИ приключи процедурите за избор на изпълнител по два проекта от Коридор VIII (22.12.2025)read Oct 5, 2026
  2. OpenStreetMap contributors (geometry, ODbL)read Oct 5, 2026