← All projects
Highways
A79 Sazeret–Digoin
The motorway-standard upgrade of the former N79 between Sazeret and Digoin.
- Total length
- 88 km
- Open today
- 88 km
- Sections
- 1
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Sazeret–Digoin The ministry reports 88.4 km. The OSM centreline cut from Sazeret to Digoin measures about 89.8 km. | Opened | 88 km |
| – | – | – | – |