← All projects
Highways
A65 Langon–Pau
The 150 km motorway between Langon and Pau, opened in December 2010.
- Total length
- 150 km
- Open today
- 150 km
- Sections
- 1
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Langon–Pau The ministry reports 150 km. The OSM centreline cut between Langon and Pau measures about 144.7 km. | Opened | 150 km |
| – | – | – | – |
Related projects
Sources
- Ministère de l’Écologie: Rapport d’activité 2010 sur les concessions d’autoroutesread Oct 13, 2026
- A’LIÉNOR: Concessionnaire de l’A65read Oct 13, 2026
- OpenStreetMap: A65 route relation 446265read Oct 13, 2026