← All projects
Highways

A69 Castres–Verfeil

The 54 km motorway link between Castres and Verfeil, mostly on a new alignment.

Total length
54 km
Open today
0 km
Under construction
54 km
Sections
1
Loading map data…

Sections

Sections of A69 Castres–Verfeil: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Castres–Verfeil

The ministry reports about 54 km. The OSM centreline cut from the Verfeil interchange to Castres measures about 52.7 km. On 12 October 2026, Atosca said the motorway could open in the first week of November after safety checks.

Under construction54 km
  1. Mar 2023Construction start
––––

Related projects

Sources

  1. Ministère de la Transition écologique: Rapport d’activité 2023 sur les concessions d’autoroutes, A69 Castres–Verfeilread Oct 13, 2026
  2. Ministère de la Transition écologique: A69 entre Castres et Toulouse, l’État va faire appel de la décision du tribunal administratif de Toulouseread Oct 13, 2026
  3. Ministère de la Transition écologique: A69 entre Castres et Toulouse, la cour administrative d’appel rétablit les autorisations environnementalesread Oct 13, 2026
  4. OpenStreetMap: A69 route relation 15745759read Oct 13, 2026
  5. ConstructionBTP: A69, un dernier survol avant sa mise en serviceread Oct 13, 2026