E18 Koskenkylä–Kotka motorway

A 53 km motorway project on Vt 7 between Koskenkylä and Kotka. It upgraded 17 km of existing road from Koskenkylä to Loviisa and built 36 km of new motorway from Loviisa to Kotka. The full route opened on 1 September 2014.

Total length
53 km
Open today
53 km
Sections
1
Cost for the project as a whole
€340MThe Nordic Investment Bank reports the project cost as EUR 340 million. It separately reports an approximately EUR 623 million service-contract value, which includes maintenance through 2026 and is not the construction cost. No price year is stated.
Loading map data…

Sections

Sections of E18 Koskenkylä–Kotka motorway: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Koskenkylä–Kotka

The EIB describes 17 km as an upgrade from Koskenkylä to Loviisa and 36 km as new motorway from Loviisa to Kotka. The OSM line follows one carriageway between the Koskenkylä and Kotka ends and measures 51.15 km, 3.5% below the reported 53 km; the sourced figure is retained.

Opened53 km
  1. Sep 1, 2014Opened
––––

Related projects

Sources

  1. Nordic Investment Bank: Finland, E18 Koskenkylä–Kotka ready ahead of scheduleread Oct 13, 2026
  2. European Investment Bank: E18 Koskenkylä–Kotka PPP Priority TENread Oct 13, 2026
  3. OpenStreetMap: Valtatie 7 route relation 14265976read Oct 13, 2026

Figures last checked against their sources in Oct 13, 2026.