Third Development Axis North (Velenje – Slovenj Gradec)

The north arm of the Third Development Axis is a new expressway link between Velenje and Slovenj Gradec. DARS lists the Velenje South–Slovenj Gradec South section at 17.5 km and under construction.

Total length
18 km
Open today
0 km
Sections
1
Loading map data…

Sections

Sections of Third Development Axis North (Velenje – Slovenj Gradec): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Velenje South – Slovenj Gradec South

OpenStreetMap currently maps only a 2.85 km H8 construction fragment, not the complete 17.5 km route. The drawn fragment is incomplete. DARS's 2025 annual report says contractors declared packages B (Škalsko jezero) and H (Konovo) complete on 29 December 2025, after which inspections, defect correction and Konovo tunnel equipment testing followed. On 12 March 2026, the government reported that DARS had completed construction works on both packages. The full Velenje–Slovenj Gradec section remains under construction. DARS lists EUR 70.3 million as the combined contract value of packages B and H only. The VAT basis is unstated, so no structured cost is recorded.

Under construction18 km–––––

Related projects

Sources

  1. DARS: Third Development Axisread Oct 11, 2026
  2. OpenStreetMap contributors: H8 construction fragments near Slovenj Gradec (ODbL)read Oct 11, 2026
  3. DARS annual report 2025: Third Development Axis North, Velenje to Slovenj Gradec works and packages B/Hread Oct 11, 2026
  4. Government of Slovenia: Third Development Axis North progress, including completion of packages B and Hread Oct 13, 2026