← All projects
Highways
A5 motorway (Maribor – Pince)
The four-lane A5 links Maribor with the Hungarian border at Pince. DARS says the complete motorway opened to traffic in October 2008.
- Total length
- 80 km
- Open today
- 80 km
- Sections
- 1
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Maribor – Pince The 79.54 km route length is listed in the Slovenian road categorisation decree. DARS includes access roads in its separate 85.2 km Pomurje motorway branch figure. OSM carriageways were collapsed to a single mapped alignment. | Opened | 80 km |
| – | – | – | – |
Related projects
- HighwaysA1 motorway (Šentilj – Koper)Same country and category
- HighwaysA2 motorway (Karavanke – Obrežje)Same country and category
- HighwaysA4 motorway (Slivnica – Gruškovje)Same country and category
- HighwaysH4 expressway (Razdrto – Vrtojba)Same country and category
- HighwaysThird Development Axis North (Velenje – Slovenj Gradec)Same country and category