Highways

A4 motorway (Slivnica – Gruškovje)

This record covers the Slivnica–Draženci and Draženci–Gruškovje motorway sections. DARS reports that the first opened in July 2009 and the second in stages in 2017 and 2018.

Total length
33 km
Open today
33 km
Sections
2
Loading map data…

Sections

Sections of A4 motorway (Slivnica – Gruškovje): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Slivnica – Draženci

DARS publishes 19.8 km for Slivnica–Draženci. The route relation available in OpenStreetMap covers this section and measures about 18.9 km.

Opened20 km
  1. Jul 2009Opened
––––
Draženci–Gruškovje

DARS reports a 13.03 km section and staged openings on 22 November 2017 and 30 November 2018. The OpenStreetMap motorway centerline from the existing Draženci lot endpoint to the Croatian border via Podlehnik measures about 14.43 km, 10.8% longer than the reported length. DARS’s investment estimate includes the parallel regional road and deviations, so no cost is recorded.

Opened13 km
  1. Jul 2015Construction start
  2. Nov 30, 2018Opened
––––

Related projects

Sources

  1. DARS: A4 Slivnica – Gruškovje construction historyread Oct 11, 2026
  2. OpenStreetMap contributors: A4 route relation 1660417 (ODbL)read Oct 11, 2026
  3. DARS: A4 Draženci–Gruškovje section construction historyread Oct 12, 2026
  4. OpenStreetMap contributors: A4 motorway connector way 474237015 (ODbL)read Oct 12, 2026