← All projects
Highways
A4 motorway (Slivnica – Gruškovje)
This record covers the Slivnica–Draženci and Draženci–Gruškovje motorway sections. DARS reports that the first opened in July 2009 and the second in stages in 2017 and 2018.
- Total length
- 33 km
- Open today
- 33 km
- Sections
- 2
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Slivnica – Draženci DARS publishes 19.8 km for Slivnica–Draženci. The route relation available in OpenStreetMap covers this section and measures about 18.9 km. | Opened | 20 km |
| – | – | – | – |
| Draženci–Gruškovje DARS reports a 13.03 km section and staged openings on 22 November 2017 and 30 November 2018. The OpenStreetMap motorway centerline from the existing Draženci lot endpoint to the Croatian border via Podlehnik measures about 14.43 km, 10.8% longer than the reported length. DARS’s investment estimate includes the parallel regional road and deviations, so no cost is recorded. | Opened | 13 km |
| – | – | – | – |
Related projects
- HighwaysA1 motorway (Šentilj – Koper)Same country and category
- HighwaysA2 motorway (Karavanke – Obrežje)Same country and category
- HighwaysA5 motorway (Maribor – Pince)Same country and category
- HighwaysH4 expressway (Razdrto – Vrtojba)Same country and category
- HighwaysThird Development Axis North (Velenje – Slovenj Gradec)Same country and category
Sources
- DARS: A4 Slivnica – Gruškovje construction historyread Oct 11, 2026
- OpenStreetMap contributors: A4 route relation 1660417 (ODbL)read Oct 11, 2026
- DARS: A4 Draženci–Gruškovje section construction historyread Oct 12, 2026
- OpenStreetMap contributors: A4 motorway connector way 474237015 (ODbL)read Oct 12, 2026