Skip to content
InfraWorldWide
← All projects
Highways

A2 motorway (Karavanke – Obrežje)

The A2 connects the Karavanke road tunnel with the Obrežje border crossing. DARS records the northern branch as complete apart from the Peračica–Podtabor carriageway completed in 2011, and the southern branch as completed in 2010.

Total length
175 km
Open today
175 km
Sections
1
Loading map data…

Sections

Sections of A2 motorway (Karavanke – Obrežje): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Karavanke – Obrežje

DARS reports 175.472 km for the route under its management in its 2022 annual report. The mapped relation measures about 179 km.

Opened175 km
  1. 2011Opened
––––

Related projects

Sources

  1. DARS: A2 Karavanke – Obrežje construction historyread Oct 11, 2026
  2. OpenStreetMap contributors: A2 route relation 1645049 (ODbL)read Oct 11, 2026
  3. DARS annual report 2022: network length under managementread Oct 11, 2026