← All projects
Highways
A2 motorway (Karavanke – Obrežje)
The A2 connects the Karavanke road tunnel with the Obrežje border crossing. DARS records the northern branch as complete apart from the Peračica–Podtabor carriageway completed in 2011, and the southern branch as completed in 2010.
- Total length
- 175 km
- Open today
- 175 km
- Sections
- 1
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Karavanke – Obrežje DARS reports 175.472 km for the route under its management in its 2022 annual report. The mapped relation measures about 179 km. | Opened | 175 km |
| – | – | – | – |
Related projects
- HighwaysA1 motorway (Šentilj – Koper)Same country and category
- HighwaysA4 motorway (Slivnica – Gruškovje)Same country and category
- HighwaysA5 motorway (Maribor – Pince)Same country and category
- HighwaysH4 expressway (Razdrto – Vrtojba)Same country and category
- HighwaysThird Development Axis North (Velenje – Slovenj Gradec)Same country and category
Sources
- DARS: A2 Karavanke – Obrežje construction historyread Oct 11, 2026
- OpenStreetMap contributors: A2 route relation 1645049 (ODbL)read Oct 11, 2026
- DARS annual report 2022: network length under managementread Oct 11, 2026