Railway Route 10 rehabilitation

INFRAKOS is rehabilitating two sections of Railway Route 10 between Fushë Kosovë, Mitrovicë and Han i Elezit.

Total length
101 km
Open today
0 km
Under construction
101 km
Sections
2
Loading map data…

Sections

Sections of Railway Route 10 rehabilitation: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Fushë Kosovë–Hani i Elezit, Phase 1

INFRAKOS gives the main alignment as 66.823 km, chainage 246+888 to 313+711. The OSM alignment measures 62.90 km between the mapped Fushë Kosovë and Han i Elezit stations. The report lists 13.857 km of secondary track separately; it is not included in this lot length.

Under construction67 km
  1. Aug 30, 2019Construction start
––
  • GCF Generale Costruzioni Ferroviarie S.p.A.Builder
Contract value €78.626M
Fushë Kosovë–Mitrovicë, Phase 2

The contract table gives chainage 246+888 to 212+519, descending northward, and 34.369 km of main alignment. The OSM alignment between the mapped Fushë Kosovë and Mitrovicë stations measures 34.43 km. Secondary tracks are not included.

Under construction34 km
  1. Oct 10, 2022Construction start
––
  • GCF Generale Costruzioni Ferroviarie S.p.A.Builder
Contract value €47.928M

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Sources

  1. INFRAKOS: Rehabilitation of Southern Part of Railway Route 10, Periodic Project Report, Biannual Report for the 1st 6 monthly period of 2026read Oct 12, 2026
  2. OpenStreetMap contributors (ODbL): Railway Route 10 from Fushë Kosovë to Han i Elezit, route relation 19013860read Oct 12, 2026
  3. OpenStreetMap contributors (ODbL): Railway Route 10 from Fushë Kosovë to Mitrovicë, route relation 8825756read Oct 12, 2026

Figures last checked against their sources in Oct 12, 2026.