Tunnels

Romanian road tunnels

Romania's notable road tunnels. The country had almost no motorway tunnels until the 2020s: the Carpathian crossings now under construction on the A1 (Pitești–Sibiu), A3 (Transylvania) and A8 (Unirii) are adding the first significant ones. The Meseș tunnel on the A3 will be the longest road tunnel in Romania at 2.7 km. Lengths here are measured from OpenStreetMap geometry of a single bore.

Total length
11 km
Open today
1 km
Under construction
7 km
Sections
11

Includes 10 km whose works another project already measures, either as shared track or as a structure inside one of its sections. Counted in full here, and once in any total that spans projects.

Loading map data…

Sections

Sections of Romanian road tunnels: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Bâlea tunnel (Transfăgărășan, DN7C)

Romania's highest road tunnel at ~2,040 m altitude, on the Transfăgărășan mountain road built by the Romanian Army 1970–1974 on Nicolae Ceaușescu's orders; the longest road tunnel in Romania until the Meseș tunnel

Opened0.9 km
  1. 1970Construction start
  2. Sep 20, 1974Opened
–
  • National budget
  • TCH (today Hidroconstrucția)Builder
–
Tunelul Nou (DN12C, Bicaz gorge)

Road tunnel on DN12C through the Bicaz gorge, alongside the older parallel bore (Tunelul Vechi). Final works value: 76 billion old lei (ROL, before the 2005 redenomination), funded entirely from the state budget, per Ziarul de Iași, May 2005.

Opened0.1 km
  1. 1991Tender awarded
  2. May 2005Opened
–
  • National budget
  • SC Tunele SA BrasovBuilder
  • Institutul de Studii si Proiectari Cai Ferate Colectiv TuneleDesigner
–
Meseș tunnel (A3)

Twin-bore tunnel under the Meseș mountains on the A3 Nușfalău – Poarta Sălajului section; it will be the longest road tunnel in Romania when complete. OpenStreetMap tags opening_date=2032

Tendered3 km
  1. Apr 2025Tender awarded
  2. 2032Expected opening
–
  • European UnionEU funds
  • National budget
  • Makyol Insaat Sanayi Turizm VE Ticaret AS – Ozaltin Insaat Ticaret VE Sanayi ASBuilder
–
Poiana tunnel (A1 Pitești–Sibiu lot 3)

On A1 Pitești–Sibiu lot 3 (Webuild); OpenStreetMap tags opening_date=2028 on this lot

Under construction2 km
  1. 2022Construction start
  2. 2028Expected opening
–
  • European UnionEU funds
  • National budget
  • Webuild SPA – TancradBuilder
–
Câineni tunnel (A1 Pitești–Sibiu lot 2)

On A1 Pitești–Sibiu lot 2, Boița–Cornet (Mapa–Cengiz); OpenStreetMap tags opening_date=2031 on this lot

Under construction2 km
  1. 2022Construction start
  2. 2031Expected opening
–
  • European UnionEU funds
  • National budget
  • Mapa – CengizBuilder
–
Lazaret tunnel (A1 Pitești–Sibiu lot 2)

Twin bores (Lazaret 1 and 2) on A1 Pitești–Sibiu lot 2, Boița–Cornet; OpenStreetMap tags opening_date=2031

Under construction1 km
  1. 2022Construction start
  2. 2031Expected opening
–
  • European UnionEU funds
  • National budget
  • Mapa – CengizBuilder
–
Robești tunnel (A1 Pitești–Sibiu lot 2)

On A1 Pitești–Sibiu lot 2, Boița–Cornet, in the Olt valley defile; OpenStreetMap tags opening_date=2031

Under construction0.9 km
  1. 2022Construction start
  2. 2031Expected opening
–
  • European UnionEU funds
  • National budget
  • Mapa – CengizBuilder
–
Balota tunnel (A1 Pitești–Sibiu lot 2)

On A1 Pitești–Sibiu lot 2, Boița–Cornet; OpenStreetMap tags opening_date=2031

Under construction0.4 km
  1. 2022Construction start
  2. 2031Expected opening
–
  • European UnionEU funds
  • National budget
  • Mapa – CengizBuilder
–
Boița tunnel (A1 Pitești–Sibiu lot 2)

Twin bores (Boița 1 and 2) at the northern end of A1 Pitești–Sibiu lot 2; OpenStreetMap tags opening_date=2031

Under construction0.3 km
  1. Feb 2026Construction start
  2. 2031Expected opening
–
  • European UnionEU funds
  • National budget
  • Mapa – CengizBuilder
–
Petru Vodă tunnel (A8)

On the A8 Ditrău–Moțca mountain section (SA&PE Construct–Tehnostrade–Euro Asfalt–Spedition UMB), crossing the Eastern Carpathians

Under construction0.9 km
  1. Sep 2023Construction start
–
  • European UnionTransport Programme 2021–2027
  • National budget
  • SA&PE Construct – Euro-Asfalt – Tehnostrade – Spedition UMBBuilder
–
Boureni tunnel (A8)

On the A8 Moțca–Târgu Frumos section approaching Iași

Under construction0.4 km
  1. Sep 2023Construction start
  2. 2030Expected opening
–
  • European UnionSAFE programme (EU)
  • SA&PE Construct – Tehnostrade – Spedition UMB – Euro-AsfaltBuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • National budget11 km
    10 sections
  • European Union10 km
    9 sections
    • EU funds
    • Transport Programme 2021–2027
    • SAFE programme (EU)

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. Wikipedia: Transfăgărășan
  2. Wikipedia (ro): Autostrada A1 (România)
  3. Wikipedia (ro): Autostrada A8 (România)
  4. OpenStreetMap contributors (geometry, lengths and construction dates, ODbL)
  5. Jurnalul Național: Opt ani la tunel (2005-06-25)read Sep 25, 2026
  6. Ora de Sibiu: Autostrada A1 Sibiu–Pitești: Încep lucrările la Tunelul Boița 1 (2026-02-14)read Sep 25, 2026
  7. Economica.net: Autostrada A1 Sibiu - Pitești. A fost străpunsă prima galerie a tunelului Boița 1 (2026-07-20)read Sep 25, 2026
  8. Economica.net: Autostrada A1 Sibiu – Pitești: Ce progrese au mai făcut turcii de la Mapa – Cengiz la tunelurile Balota și Robești (2026-09-25)read Sep 25, 2026
  9. Economica.net: Autostrada Transilvania: CNAIR semnează joi cel mai mare contract din istoria sa, cel pentru Tunelul Meseș (2025-04-08)read Sep 25, 2026
  10. Economica.net: Autostrada A3 Transilvania. Tronsonul cu cel mai lung tunel ar putea avea autorizație de construire până la finalul anului (2026-07-30)read Sep 25, 2026
  11. Economica.net: Autostrada A1 Sibiu - Pitești. Lucrările la secțiunea 3 se apropie de 15% (2026-07-17)read Sep 25, 2026
  12. Ziarul de Iași: Tunel sapat in stinca, inaugurat in Cheile Bicazului (2005-05-23)read Sep 25, 2026 · archived copy
  13. S.C. Tunele S.A. Brașov: N 12 C Gheorgheni – Bicaz Tunel Lacu Rosuread Sep 25, 2026 · archived copy
  14. Economedia: Autostrada Unirii A8: CNIR a semnat cu UMB contractul pentru tronsonul 1 Târgu Neamț – Târgu Frumos (2026-05-28)read Sep 25, 2026
  15. HotNews.ro: Cel mai scump tronson din Autostrada Unirii: UMB și o asociere din Turcia au depus oferte (2025-03-05)read Sep 25, 2026
  16. Economica.net: VIDEO Autostrada A1 Sibiu – Pitești: Au început lucrările propriu-zise la tunelul Robești, primul din secțiunea montană Boița – Cornetu (2025-10-08)read Sep 28, 2026
  17. AGERPRES: REPORTAJ/Vâlcea: Tunelul Robești, primul realizat prin dinamitare de pe segmentele de autostradă care trec prin județ (2026-02-07)read Sep 28, 2026
  18. Monitorul de Roman: Încă un pas pentru A8, contract semnat pentru lotul 2B Grințieș-Pipirigread Sep 28, 2026