Highways
A4 Skopje–Blace motorway, Phase 2
The 10.5 km second phase of the A4 from Stenkovec interchange to the Blace border crossing.
- Total length
- 11 km
- Open today
- 0 km
- Under construction
- 11 km
- Sections
- 1
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Stenkovec–Blace, Phase 2 PESR reports the 10.5 km section from Stenkovec interchange to the border crossing, construction commencement on 27 August 2026, and a four-year construction period. The works include five twin-tube tunnels and eight bridges. Published EBRD loan and WBIF grant figures are financing commitments, not project cost, so cost is omitted. | Under construction | 11 km |
| – | – |
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Sources
- PESR: Foundation stone laid for the most complex motorway, Skopje–Blace Phase 2read Oct 12, 2026
- OpenStreetMap contributors: A4 construction alignment between Stenkovec and Blace, downloaded 12 October 2026read Oct 12, 2026
Figures last checked against their sources in Oct 12, 2026.