A4 Skopje–Blace motorway, Phase 2

The 10.5 km second phase of the A4 from Stenkovec interchange to the Blace border crossing.

Total length
11 km
Open today
0 km
Under construction
11 km
Sections
1
Loading map data…

Sections

Sections of A4 Skopje–Blace motorway, Phase 2: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Stenkovec–Blace, Phase 2

PESR reports the 10.5 km section from Stenkovec interchange to the border crossing, construction commencement on 27 August 2026, and a four-year construction period. The works include five twin-tube tunnels and eight bridges. Published EBRD loan and WBIF grant figures are financing commitments, not project cost, so cost is omitted.

Under construction11 km
  1. Aug 27, 2026Construction start
––
  • Granit ADBuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Sources

  1. PESR: Foundation stone laid for the most complex motorway, Skopje–Blace Phase 2read Oct 12, 2026
  2. OpenStreetMap contributors: A4 construction alignment between Stenkovec and Blace, downloaded 12 October 2026read Oct 12, 2026

Figures last checked against their sources in Oct 12, 2026.