Railways

Rail Baltica in Poland: Warszawa Rembertów – Sadowne – Czyżew – Białystok – Ełk (lines 449, 6 and 38, E75)

Modernisation of the existing Warszawa – Białystok – Ełk railway for 160–200 km/h, the Polish part of the E75 corridor towards Lithuania. PKP PLK splits it into stages, each with its own contract and EU Connecting Europe Facility (CEF) project: Warszawa Rembertów – Sadowne (main works finished 2015), Sadowne – Czyżew (contract 2017, second track in service 30 December 2019), Czyżew – Białystok (contract 26 June 2020, works at the finishing stage in January 2025) and Białystok – Ełk (contract signed 15 September 2026). The Ełk – Trakiszki (Lithuanian border) section is still at design stage and is not drawn. Lots are drawn on one track of the existing line from OpenStreetMap. Contract values are net of VAT where PLK states it; the net and gross values, and the contract and the whole CEF project, are different figures and are kept apart in the lot notes.

Total length
271 km
Open today
105 km
Under construction
71 km
Sections
4
Cost on record
€1.1B
1 of 4 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of Rail Baltica in Poland: Warszawa Rembertów – Sadowne – Czyżew – Białystok – Ełk (lines 449, 6 and 38, E75): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Warszawa Rembertów – Zielonka – Wołomin – Tłuszcz – Sadowne

Draws the line from the junction of line 449 at Rembertów through Zielonka, Wołomin and Tłuszcz to Sadowne Węgrowskie. PLK dates the end of the main works to 2015 and reports 4 stations and 14 stops rebuilt, more than 60 km of track replaced, 8 bridges and 24 level crossings; trains returned to Tłuszcz – Sadowne on 13 December 2015 after a closure from 12 October 2014 (pl.wikipedia). PLK's press release of 27 May 2014 gives the project as more than 66 km of line. The PLN 1.5 billion cost is a PAP statement quoted by Forsal in March 2018. Grade-separated crossings continue under CEF project 2014-PL-TMC-0182-W, whose period runs to December 2024, and separate contracts were let for them, for example five signed on 19 May 2017 with PW Banimex and Budrex-Kobi (pl.wikipedia); these are not priced here. The contracts for the individual sub-sections (Rembertów – Wołomin, Wołomin – Tłuszcz, Tłuszcz – Sadowne) were not found, so the stage is one lot.

Opened66 km
  1. 2015Opened
  • Actual zł1.5BPress figure, about PLN 1.5 billion; VAT basis and price year not stated.
  • European UnionThe remaining works on this section (grade-separated crossings at Kobyłka, Jasienica, Łochów, Topór, Tłuszcz, Zielonka and Mokra Wieś) belong to CEF project 2014-PL-TMC-0182-W, which also covers Sadowne – Czyżew: total cost EUR 235.2 million, EU contribution EUR 179.2 million
––
Sadowne – Czyżew

Contract signed 13 June 2017 for over PLN 641 million (VAT basis not stated), PLN 467 million of it from CEF, under project 2014-PL-TMC-0182-W. Scope: Małkinia and Sadowne stations, 12 platforms, about 70 km of single track, 11 level crossings, 3 bridges including a new bridge over the Bug and a second track on Prostyń Bug – Małkinia, and a local control centre at Małkinia. PLK says the second track was handed over on 30 December 2019 and Railway Gazette reports a PLN 560 million modernisation completed that day on 38.9 km Sadowne Węgrowskie – Czyżew; PLK's own page speaks of more than 36 km modernised, and its press release of 24 January 2020 gives PLN 569 million for the investment. The start of construction is not stated in the sources found. The drawn track, cut at the Czyżew station node, is 1.7% longer than the sourced 38.9 km; the sourced length is kept.

Opened39 km
  1. Jun 13, 2017Tender awarded
  2. Dec 30, 2019Opened
  • Actual zł560Mworks onlyRailway Gazette: a PLN 560 million modernisation; VAT basis and price year not stated.
  • European UnionConnecting Europe Facility: PLK states PLN 467 million of the contract value comes from CEF
  • Przedsiębiorstwo Usług Technicznych IntercorBuilder
Contract value zł641M
Czyżew – Białystok

Contract signed 26 June 2020 for over PLN 3.3 billion net. Over 71 km of line for 200 km/h: 5 stations rebuilt (Czyżew, Szepietowo, Łapy, Racibory, Białystok), a new station at Baciuty, 11 stops, a 200 m bridge over the Narew and grade-separated crossings. The sources describe two CEF phases (projects 2015-PL-TM-0002-W and 2019-PL-TMC-0322-W). Works were planned for 2020–2023. Later PLK releases give the value of the whole investment as almost PLN 3.4 billion and move the end of works to 2024 (19 July 2024: 24 of 25 road crossings ready, works at Białystok and Łapy continuing). On 14 January 2025 PLK wrote that work on the section was "obecnie są na ukończeniu"; no completion notice or later release was found, so the status follows that last source and no opening date is recorded. Opened in stages: platforms at Białystok and Białystok Zielone Wzgórza from September 2023, and the rebuilt Białystok station fully in use from September 2024. The drawn track starts at the Czyżew station node and is 8% shorter than the sourced 71 km, which PLK counts as 71.24 km of track from the Podlaskie border west of Czyżew; the Czyżew and Białystok stations are about 65.5 km apart on line 6 (pl.wikipedia). The sourced length is kept.

Under construction71 km
  1. Jun 26, 2020Tender awarded
  2. Sep 17, 2020Construction start
–
  • European UnionConnecting Europe Facility: PLK cites a grant of over PLN 1.2 billion for this section; the CEF programme for both Czyżew – Białystok phases is over EUR 800 million with over EUR 668 million from the EU
  • Przedsiębiorstwo Usług Technicznych IntercorBuilder
  • Stecol CorporationBuilder
  • Sinohydro Corporation LimitedBuilder
Contract value zł3.3B
Białystok – Ełk (line 38)

Contract signed 15 September 2026 for PLN 4,084 million net (PLN 5,023 million gross) with a consortium of Track Tec Construction (leader), INTOP S.A., INTOP INFRASTRUKTURA S.A., UNIBEP S.A. and Pomorskie Przedsiębiorstwo Mechaniczno-Torowe. Almost 95 km of double-track line for up to 200 km/h, 8 stations and 10 stops, 20 road and 12 rail viaducts and 12 underpasses; work is planned to the fourth quarter of 2029. The drawn track of the existing line 38 is 9% longer than the stated length; the stated length is kept. Works have not started in the sources found.

Tendered95 km
  1. Sep 15, 2026Tender awarded
–
  • European UnionConnecting Europe Facility, under the projects Białystok – Knyszyn, Knyszyn – Osowiec and Osowiec – Ełk
  • Track Tec ConstructionBuilder
  • INTOPBuilder
  • INTOP INFRASTRUKTURABuilder
  • UNIBEPBuilder
  • Pomorskie Przedsiębiorstwo Mechaniczno-ToroweBuilder
Contract value zł4.1B

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • European Union271 km
    4 sections
    • The remaining works on this section (grade-separated crossings at Kobyłka, Jasienica, Łochów, Topór, Tłuszcz, Zielonka and Mokra Wieś) belong to CEF project 2014-PL-TMC-0182-W, which also covers Sadowne – Czyżew: total cost EUR 235.2 million, EU contribution EUR 179.2 million
    • Connecting Europe Facility: PLK states PLN 467 million of the contract value comes from CEF
    • Connecting Europe Facility: PLK cites a grant of over PLN 1.2 billion for this section; the CEF programme for both Czyżew – Białystok phases is over EUR 800 million with over EUR 668 million from the EU
    • Connecting Europe Facility, under the projects Białystok – Knyszyn, Knyszyn – Osowiec and Osowiec – Ełk

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. PKP PLK: Rail Baltica Białystok-Ełk – rekordowa umowa i inwestycja (15 September 2026)read Oct 10, 2026
  2. PKP PLK: Rail Baltica: rusza modernizacja odcinka Czyżew – Białystok (26 June 2020)read Oct 10, 2026
  3. PKP PLK: Rail Baltica: ruszyła przebudowa Czyżew-Białystok (17 September 2020)read Oct 10, 2026
  4. Rynek Kolejowy: PLK ruszają z dalszą modernizacją Rail Baltiki (13 June 2017)read Oct 10, 2026
  5. Kolej na wschód: Sadowne – Czyżew po obu torach! (30 December 2019, web.archive.org copy)read Oct 10, 2026
  6. Kolej na wschód: O inwestycji (web.archive.org copy, 24 September 2023)read Oct 10, 2026
  7. Railway Gazette: Polish-Chinese consortium to upgrade Białystok lineread Oct 10, 2026
  8. Forsal.pl: PKP PLK: w połowie 2018 r. przetarg na odcinek Rail Baltica Czyżew-Białystok (12 March 2018)read Oct 10, 2026
  9. PKP PLK investment map: 2014-PL-TMC-0182-W Prace na linii E75 na odcinku Sadowne – Czyżew wraz z robotami pozostałymi na odcinku Warszawa Rembertów – Sadowneread Oct 10, 2026
  10. PKP PLK investment map: 2019-PL-TMC-0322-W Prace na linii E75 na odcinku Czyżew – Białystok (faza II)read Oct 10, 2026
  11. Wikipedia (pl): Linia kolejowa nr 6read Oct 10, 2026
  12. PKP PLK: Ruszyła modernizacja linii Rail Baltica (27 May 2014)read Oct 10, 2026
  13. PKP PLK: Rail Baltica. Podróże Warszawa – Białystok dwoma torami nad Bugiem (24 January 2020)read Oct 10, 2026
  14. PKP PLK: Rail Baltica: szybsze i wygodniejsze podróże na linii Warszawa – Białystok (11 December 2023)read Oct 10, 2026
  15. PKP PLK: Podlaskie: tunel w Baciutach usprawnia ruch kolejowy i drogowy (19 July 2024)read Oct 10, 2026
  16. PKP PLK: Województwo podlaskie – PLK SA podsumowują rok 2024 (14 January 2025)read Oct 10, 2026
  17. OpenStreetMap: railway ways of lines 449, 6 and 38 (geometry, ODbL)read Oct 10, 2026
  18. OpenStreetMap contributors: route geometry (ODbL)read Oct 10, 2026

Figures last checked against their sources in Oct 10, 2026.