Thumanë–Kashar motorway
The 21 km Thumanë–Kashar section of Albania’s Corridor Blu opened to traffic on 30 June 2024.
- Total length
- 21 km
- Open today
- 21 km
- Sections
- 1
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Thumanë–Kashar ARRSH describes the route as about 21 km. OSM geometry measures 21.48 km between the mapped northern Thumanë endpoint and the Kashar interchange. | Opened | 21 km |
| – | – | – | – |
Sources
- ARRSH: Vazhdojnë punimet në kantierin e aksit Thumanë-Kashar (12 June 2023)read Oct 12, 2026
- ARRSH: Hapet për qarkullimin e automjeteve datë 30 qershor aksi Thumanë-Kashar (27 June 2024)read Oct 12, 2026
- OpenStreetMap contributors (ODbL): Thumanë–Kashar motorway section, from relation 12925304read Oct 12, 2026