Thumanë–Kashar motorway

The 21 km Thumanë–Kashar section of Albania’s Corridor Blu opened to traffic on 30 June 2024.

Total length
21 km
Open today
21 km
Sections
1
Loading map data…

Sections

Sections of Thumanë–Kashar motorway: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Thumanë–Kashar

ARRSH describes the route as about 21 km. OSM geometry measures 21.48 km between the mapped northern Thumanë endpoint and the Kashar interchange.

Opened21 km
  1. Jun 30, 2024Opened
––––