Danube bridge at Bačka Palanka
Bridge over the Danube between Bačka Palanka and Neštin with access roads, part of state road IB-19 (M-18). It has two traffic lanes and two footpaths, 12 m wide in total. Contracted with Centunion S.A. of Spain under an intergovernmental agreement.
- Total length
- 3 km
- Open today
- 0 km
- Sections
- 1
- Cost on record
- €129.93M
- 1 of 1 sections carry a comparable figure
Restated into EUR at 2025 prices.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Bridge and access roads Commercial contract of 30 December 2025 between the financier, the investor and the contractor, for design and construction. Designed route 3,352.23 m including a 1,856.04 m bridge (Bačka Palanka approach viaduct, main bridge over the navigation channel, Neštin approach viaduct). Contract amount 129,932,416.81 EUR: phase 1 (design, preparatory works, piling and foundations) 21,052,631.61 EUR, paid net 20,000,000.00 EUR after a retention deposit, starting within 35 days of the contract taking effect; phase 2 (all remaining works) 108,879,785.20 EUR, starting once the contractor receives the advance payment. Completion: phase 1 24 months, phase 2 30 months. The ministry shows the status as implementation under way but gives no start date for works, so the lot stays tendered. In OpenStreetMap the crossing is mapped as proposed road ref 19, with 1.27 km tagged as bridge; the drawn route is 3.34 km. | Tendered | 3 km |
| – |
|
| Contract value €129.93M |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- National budget3 km1 section
- Serbian budget. Financing starts in 2026 with 5 million EUR.
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.