Mihajlo Pupin Bridge
Road bridge over the Danube in Belgrade, linking Zemun and Borča. Built by China Road and Bridge Corporation, opened on 18 December 2014.
- Total length
- 2 km
- Open today
- 2 km
- Sections
- 1
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Zemun–Borča bridge Bridge length 1,507 m, longest span 172 m. Wikipedia gives €170 million for the bridge and €260 million for the whole project with access roads, without a contract value or price basis, so no cost is recorded. English Wikipedia gives October 2011 for the start and Serbian Wikipedia says the site opened in July 2011, so only the year is recorded. A precontract with the Chinese partners was signed in late 2009. The drawn OpenStreetMap line is 1.49 km. | Opened | 2 km |
| – |
|
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Funding
- Loan2 km1 section
- Exim Bank of China, 85%; Serbia and Belgrade, the remaining 15%.
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- BridgesPelješac Bridge and access roadsSame contractor: China Road and Bridge Corporation
- HighwaysFruška Gora Corridor (Novi Sad – Ruma)Same contractor: China Road and Bridge Corporation
- RailwaysNiš – Dimitrovgrad Railway ModernisationSame contractor: China Road and Bridge Corporation
- BridgesNovi Sad bypass with Danube bridge (state road IIA-111)Same contractor: China Road and Bridge Corporation
- BridgesAda BridgeSame country and category
- BridgesDanube bridge at Bačka PalankaSame country and category
Sources
- Wikipedia: Mihajlo Pupin Bridgeread Oct 9, 2026
- Wikipedia (sr): Pupinov mostread Oct 9, 2026
- OpenStreetMap contributors: Пупинов мост (ODbL)read Oct 9, 2026