Bridges

Ada Bridge

Cable-stayed road bridge over the Sava in Belgrade, 996 m long with a 376 m main span. Opened to traffic on 1 January 2012.

Total length
1 km
Open today
1 km
Sections
1
Loading map data…

Sections

Sections of Ada Bridge: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Ada Bridge over the Sava

Bridge length 996 m, main span 376 m. English Wikipedia gives €360.2 million and Serbian Wikipedia €161 million (with access roads, as planned) without stating whether it covers the bridge alone or the whole project with access roads, so no cost is recorded. The English page also names the EBRD and private financiers without a citation. Main works began in December 2008 on the right bank. The drawn OpenStreetMap line (one carriageway) is 0.92 km.

Opened1 km
  1. Dec 2008Construction start
  2. Jan 1, 2012Opened
–
  • LoanEuropean Investment Bank loan, 85% of the cost according to Serbian Wikipedia, citing a State Audit Institution report.
  • PorrBuilder
  • Slovenija ceste TehnikaBuilder
  • DSD BrückenbauBuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • Loan1 km
    1 section
    • European Investment Bank loan, 85% of the cost according to Serbian Wikipedia, citing a State Audit Institution report.

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.