Skip to content
InfraWorldWide
← All projects
Railways

HSL-Zuid

Dedicated high-speed railway infrastructure between Hoofddorp and Rotterdam and between Rotterdam Lombardijen and the Belgian border. HSL trains use conventional tracks on the remaining corridor sections.

Total length
95 km
Open today
95 km
Sections
2
Loading map data…

Sections

Sections of HSL-Zuid: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Hoofddorp–Rotterdam Centraal

The 125 km corridor includes conventional track between Amsterdam and Hoofddorp and between Rotterdam and Barendrecht. This lot covers only the dedicated Hoofddorp–Rotterdam high-speed infrastructure. Length measured from OpenStreetMap geometry: 46.94 km.

Opened47 km
  1. Sep 7, 2009Opened
––––
Rotterdam Lombardijen–Belgian border

The government identifies the new high-speed infrastructure from Barendrecht to the Belgian border; NS describes the fast section as Rotterdam Lombardijen–the Belgian border. Conventional track between Rotterdam and Barendrecht is excluded. Length measured from OpenStreetMap geometry: 48.32 km.

Opened48 km
  1. Dec 13, 2009Opened
––––

Sources

  1. NS: High-speed rail lineread Oct 13, 2026
  2. Dutch Parliament: HSL-Zuid corridor scope and opening datesread Oct 13, 2026
  3. OpenStreetMap: HSL-Zuid route relation 5823319read Oct 13, 2026