← All projects
Highways
M4 Törökszentmiklós–Kisújszállás
The M4 expressway section from Törökszentmiklós to Kisújszállás, handed over to traffic in January 2026.
- Total length
- 34 km
- Open today
- 34 km
- Sections
- 1
Category
Highways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Törökszentmiklós–Kisújszállás Km 118+000–152+290. The official 34.29 km length is from the traffic commissioning permit, effective on 22 December 2025 at 15:00. The OpenStreetMap line follows one M4 carriageway from the SOS marker tagged M4 km 116+000, cut 2 km farther along the route to km 118+000, to the M4 relation endpoint at the permitted km 152+290 boundary. The line measures 34.13 km, about 0.16 km shorter than the official length. | Opened | 34 km |
| – | – | – | – |
Related projects
- HighwaysM0 Budapest ring roadSame country and category
- HighwaysM1 motorway wideningSame country and category
- HighwaysM3 motorway (Budapest – Gödöllő – Hatvan – Füzesabony – Nyíregyháza – Vásárosnamény – Ukrainian border)Same country and category
- HighwaysM30 motorway: Miskolc–SzikszóSame country and category
- HighwaysM35 motorway (Görbeháza – Debrecen – Berettyóújfalu)Same country and category
- HighwaysM44 expressway (Kecskemét – Kunszentmárton – Békéscsaba)Same country and category
Sources
- ÉKM: M4 expressway Törökszentmiklós–Kisújszállás (East), traffic handover and project detailsread Oct 12, 2026
- Budapest Government Office: M4 Törökszentmiklós–Kisújszállás traffic commissioning permit, km 118+000–152+290read Oct 11, 2026
- OpenStreetMap contributors: relation 9758619, M4 route and member ways (ODbL)read Oct 11, 2026
Figures last checked against their sources in Oct 12, 2026.