M30 motorway: Miskolc–Szikszó
This record covers only construction section A, Miskolc–Szikszó (km 30+100–40+500), of the official Miskolc–Tornyosnémeti project. The other construction sections are not included. Section A opened in 2021, closed in February 2024 after subsidence, and reopened on 30 December 2025.
- Total length
- 10 km
- Open today
- 10 km
- Sections
- 1
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Miskolc–Szikszó, construction section A Official limits are km 30+100–40+500, length 10.4 km. OSM relation 23060 represents the M30 route; geometry follows one carriageway. Its route distance was calibrated linearly to the official Miskolc-north junction at km 32+050 and Szikszó interchange at km 39+836.41. The resulting line measures 10.31 km. Traffic opening is recorded as October 2021 only: the project portal lists 19 October, the traffic-use permit takes effect on 22 October at 08:00, and the government records the ceremony on 26 October. The ministry reports closure in February 2024; MKIF later reported reopening at 10:30 on 30 December 2025, before the minister’s announced 18:00 time. | Opened | 10 km |
| – | – | – | – |
Related projects
- HighwaysM0 Budapest ring roadSame country and category
- HighwaysM1 motorway wideningSame country and category
- HighwaysM3 motorway (Budapest – Gödöllő – Hatvan – Füzesabony – Nyíregyháza – Vásárosnamény – Ukrainian border)Same country and category
- HighwaysM35 motorway (Görbeháza – Debrecen – Berettyóújfalu)Same country and category
- HighwaysM4 Törökszentmiklós–KisújszállásSame country and category
- HighwaysM44 expressway (Kecskemét – Kunszentmárton – Békéscsaba)Same country and category
Sources
- Ministry of Construction and Transport: M30 motorway Miskolc–Tornyosnémeti project, construction sections and lengthsread Oct 11, 2026
- Budapest Government Office: M30 Miskolc–Tornyosnémeti traffic-use permit, km 30+100–86+848.05read Oct 11, 2026
- Ministry of Construction and Transport: Arnót roundabout works after the M30 closureread Oct 11, 2026
- Magyar Építők: reopened M30 section, reporting MKIF reopening noticeread Oct 11, 2026
- OpenStreetMap contributors: relation 23060, M30 route and member ways (ODbL)read Oct 11, 2026
- Government of Hungary: M30 opening ceremony in Tornyosnémeti, 26 October 2021read Oct 11, 2026
Figures last checked against their sources in Oct 11, 2026.