Skip to content
InfraWorldWide
← All projects
Railways

Pottendorfer Linie upgrade

ÖBB upgraded the Pottendorfer Linie between Wien Meidling and Wiener Neustadt. Double tracking was completed through Wampersdorf by 2023. Further station and line works between Wampersdorf and Ebenfurth are ongoing.

Total length
52 km
Open today
52 km
Sections
1
Loading map data…

Sections

Sections of Pottendorfer Linie upgrade: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Wien Meidling–Wiener Neustadt

ÖBB gives 52 km for the full Wien Meidling–Wiener Neustadt route. The existing double-track section from Wampersdorf to Wiener Neustadt was not a new double-tracking work. Station and loop upgrades between Wampersdorf and Ebenfurth continue separately. The OSM line follows one railway alignment and draws about 50 km.

Opened52 km
  1. 2016Construction start
  2. 2023Opened
––––

Related projects

Sources

  1. ÖBB-Infrastruktur: Pottendorfer Linie, construction milestonesread Oct 10, 2026
  2. ÖBB Südstrecke: Pottendorfer Linieread Oct 10, 2026
  3. OpenStreetMap: Pottendorfer Linie rail geometry, ÖBB ref 106 01read Oct 10, 2026