Brenner Base Tunnel, Austrian section
The Austrian section of the Brenner Base Tunnel runs from the Sillschlucht near Innsbruck to the Italian border at Brenner. Construction packages H21, H33, H41, H52 and H53 cover the works on this section.
- Total length
- 30 km
- Open today
- 0 km
- Under construction
- 30 km
- Sections
- 1
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Sillschlucht–Brenner state border The line is measured from the OSM west main bore between Sillschlucht and the state border; the mapped Austrian section is about 29.9 km. BBT lists separate package awards: H21 EUR 59.5 million to PORR, H33 EUR 377 million to Strabag and Webuild, H41 EUR 651 million to Implenia, Webuild and CSC, H52 EUR 120 million to Swietelsky, and H53 EUR 959 million to PORR and Marti. The packages contain overlapping tunnel and ancillary works, so the award values are not summed or assigned as the cost of this route lot. The Italian packages are excluded. | Under construction | 30 km |
| – | – | – | – |
Related projects
Sources
- BBT SE: Construction lot H21 Sillschluchtread Oct 10, 2026
- BBT SE: Construction lot H33 Tulfes–Pfonsread Oct 10, 2026
- BBT SE: Construction lot H41 Sillschlucht–Pfonsread Oct 10, 2026
- BBT SE: Construction lot H52 Hochstegenread Oct 10, 2026
- BBT SE: Construction lot H53 Pfons–Brennerread Oct 10, 2026
- BBT SE: Brenner Base Tunnel project overview and opening targetread Oct 10, 2026
- BBT SE: Tender awarded for construction lot H53 Pfons–Brennerread Oct 13, 2026
- OpenStreetMap: Brenner Base Tunnel, west main boreread Oct 10, 2026