Railways
Koralmbahn Graz–Klagenfurt
The Koralmbahn is a new double-track line between Graz and Klagenfurt. The route entered scheduled passenger service on 14 December 2025. It includes the 32.894 km Koralmtunnel and sections that entered service earlier.
- Total length
- 125 km
- Open today
- 125 km
- Sections
- 1
Category
Railways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Graz–Klagenfurt new line The Austrian Court of Audit reports a route length of about 125 km and an ÖBB end-2023 forecast of €6.139 billion. ÖBB publishes 130 km for the Koralmbahn corridor; the cited length follows the audit report. The OSM geometry contains the two parallel tracks tagged with ÖBB ref 401 01, so its drawn length is about twice the single route length. | Opened | 125 km |
| – | – | – | – |
Related projects
Sources
- ÖBB-Infrastruktur: Koralmbahn sectionsread Oct 10, 2026
- Austrian Court of Audit: Koralmbahn project reportread Oct 10, 2026
- Wikipedia: Koralmbahnread Oct 10, 2026
- OpenStreetMap: Koralmbahn rail geometry, ÖBB ref 401 01read Oct 10, 2026