← All projects
Railways
Marchegger Ostbahn upgrade and electrification
The Austrian section between Wien Stadlau and Marchegg was modernised and electrified. The line was rebuilt as a double-track route in stages.
- Total length
- 37 km
- Open today
- 37 km
- Sections
- 1
Category
Railways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Wien Stadlau–Marchegg upgrade and double tracking ÖBB gives about 37 km for the Austrian route between Vienna and Marchegg. The OSM centerline follows one rail alignment and draws about 36 km. The Marchegg–state border section is described separately by ÖBB and is not included in this lot. | Opened | 37 km |
| – | – | – | – |
Related projects
Sources
- ÖBB-Infrastruktur: Marchegger Ostbahn, construction milestonesread Oct 10, 2026
- ÖBB Südstrecke: Marchegger Ostbahnread Oct 10, 2026
- OpenStreetMap: Marchegger Ostbahn rail geometry, ÖBB line ref 117 01read Oct 10, 2026