A27 Kozani – Ptolemaida – Florina – Niki
Vertical axis 50 of the Egnatia Odos, from the A2 at Kozani by way of Ptolemaida and Florina to the border crossing with North Macedonia at Niki, about 78.5 km in all. Only the Florina – Niki motorway section (14.5 km, opened 20 May 2016) is recorded as a lot here. Kozani – Ptolemaida is also a motorway, but the sources give no length or opening date for it, so it is not drawn. Ptolemaida – Florina runs as an expressway and is planned for upgrade to a motorway; no source gives the extent of the upgrade.
- Total length
- 15 km
- Open today
- 15 km
- Sections
- 1
- Cost on record
- €107.606M
- 1 of 1 sections carry a comparable figure
Restated into EUR at 2025 prices.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Florina – Niki Four-lane road with a 17 m cross section, central reserve and two interchanges (Florina and Kato Klines – Ano Kalliniki) plus an intersection at Niki, per Egnatia Odos. Construction start is given as 2013 by English Wikipedia and as 2012 by Greek Wikipedia; Egnatia Odos announced on 29 November 2011 that the construction contract had been positively evaluated by the Parliamentary Standing Committee on Economic Affairs (22 November 2011), and expected works to begin in the first quarter of 2012. Egnatia Odos expected the AKTOR ATE – TERNA – MOCHLOS joint venture to build it; no later source confirms the contract, so no contractor is recorded. Length 14.5 km is the sourced figure; the OSM line drawn from the Florina interchange to Niki measures about 13.5 km. | Opened | 15 km |
|
|
| – | – |
Funding
- European Union15 km1 section
- Included in the 2007–2013 operational programme "Improvement of Accessibility" (Egnatia Odos announcement). No amount is published.
A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.
Related projects
- HighwaysA1 Motorway Athens – Thessaloniki – Evzonoi (PATHE)Same country and category
- HighwaysA2 Egnatia Odos (Igoumenitsa – Kipoi)Same country and category
- HighwaysA25 Thessaloniki – Serres – PromachonasSame country and category
- HighwaysA29 Siatista – Kastoria – KrystallopigiSame country and category
- HighwaysA5 Ionia Odos (Antirrio – Ioannina)Same country and category
- HighwaysA52 Amvrakia Odos (Aktio – Amvrakia)Same country and category
Corridors
The designations this project is recorded under. Both schemes are kept: the Pan-European corridors are how these projects were described when they were planned, and TEN-T is what EU money is allocated on today.
- Pan-European Corridor XPan-European
Sources
- Wikipedia: A27 motorway (Greece)read Oct 5, 2026
- Greek Wikipedia: Αυτοκινητόδρομος 27 (Ελλάδα)read Oct 5, 2026
- Egnatia Odos S.A.: A new project for Egnatia Odos S.A. (29 November 2011)read Oct 5, 2026 · archived copy
- OpenStreetMap contributors (geometry, ODbL)read Oct 5, 2026
Figures last checked against their sources in Oct 5, 2026.