The 27.3 km Semmering Base Tunnel links Gloggnitz and Mürzzuschlag beneath the Semmering Pass. It is under construction as part of the Vienna–Villach Southern Railway upgrade.

Total length
27 km
Open today
0 km
Under construction
27 km
Sections
1
Loading map data…

Sections

Sections of Semmering Base Tunnel: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Gloggnitz–Mürzzuschlag tunnel

ÖBB reports that the final breakthrough in the Gloggnitz section took place on 29 November 2024. Technical tunnel equipment works began in summer 2025. The tunnel is scheduled to open at the end of 2029; ÖBB says the first trains will run in 2030. The mapped OSM tunnel line measures 27.1 km, close to the sourced 27.3 km. This lot records the full tunnel route; individual construction-contract scopes are not split because their route lengths are not stated on the project overview.

Under construction27 km
  1. Apr 25, 2012Construction start
  2. 2030Expected opening
––––

Related projects

Sources

  1. ÖBB-Infrastruktur: Semmering Base Tunnelread Oct 10, 2026
  2. Wikipedia: Semmering-Basistunnelread Oct 10, 2026
  3. OpenStreetMap: Semmering Base Tunnel construction way 394410162read Oct 10, 2026
  4. ÖBB-Infrastruktur: Current Semmering Base Tunnel project updatesread Oct 13, 2026