A 11 Karawanken Tunnel second tube

The new tube of the cross-border Karawanken Tunnel. This project records the section on Austrian territory.

Total length
4 km
Open today
4 km
Sections
1
Loading map data…

Sections

Sections of A 11 Karawanken Tunnel second tube: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Karawanken Tunnel second tube, Austrian section

The new tube is 7.948 km long, of which 4.402 km lies in Austria. The mapped Austrian section measures about 4.45 km and ends at the state border. The ceremonial opening was on 18 March 2026; traffic moved into the new tube from 20 March and the transfer was complete by 27 March. Refurbishment of the old western tube is excluded.

Opened4 km
  1. Mar 2026Opened
––––