D1 motorway (Praha – Brno – Ostrava – Polish border)

Czechia's Praha – Brno – Ostrava motorway, drawn from Spořilov (km 0) to the Polish border, where it meets Poland's A1. Sections opened from 1971 (Spořilov – Mirošovice) to 1992 between Prague and Vyškov, from 2005 to 2011 between Vyškov and Říkovice, from 2007 to 2012 on the former D47 between Lipník nad Bečvou, Ostrava and the border, in December 2019 between Přerov and Lipník nad Bečvou, and in December 2025 between Říkovice and Přerov. Lots follow the cs.wikipedia section table, checked against ŘSD leaflets and the ŘSD D47 brochure where they exist; sections of the same era are listed one by one where their opening dates differ. Chainage starts at Spořilov, and km 0–5.2 has been a Prague local road since 1 January 2023. The 2013–2021 modernisation of Mirošovice – Kývalka (21 sections, about 161 km) and the rebuild of the Brno sections (01191.C reopened in April 2025, 01191.A under construction since October 2025) rework carriageways that were already open, so they are not lots and add no length. Where a source's section length differs from the drawn centreline, the sourced length is kept.

Total length
377 km
Open today
377 km
Sections
33
Cost on record
€500.871M
2 of 33 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of D1 motorway (Praha – Brno – Ostrava – Polish border): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Spořilov – Mirošovice

Dates and length from the cs.wikipedia section table (chainage km 0–21.255); no ŘSD leaflet covers this section. Km 0–5.2 became a Prague local road on 1 January 2023 and is no longer part of the motorway; the chainage was kept.

Opened21 km
  1. Sep 8, 1967Construction start
  2. Jul 12, 1971Opened
––––
Mirošovice – Hořice

Dates and length from the cs.wikipedia section table (chainage km 21.255–74.94); no ŘSD leaflet covers this section. Construction started between December 1969 and July 1972 depending on the part; the earliest is recorded.

Opened54 km
  1. Dec 1969Construction start
  2. Jul 1977Opened
––––
Hořice – Jiřice

Dates and length from the cs.wikipedia section table (chainage km 74.94–85.2); no ŘSD leaflet covers this section. Opened at half profile on 6 May 1979 and at full profile on 6 October 1979.

Opened10 km
  1. Jun 1974Construction start
  2. May 6, 1979Opened
––––
Jiřice – Krasoňov

Dates and length from the cs.wikipedia section table (chainage km 85.2–92.7); no ŘSD leaflet covers this section. Length is the sum of Jiřice – Humpolec (6.114 km) and Humpolec – Krasoňov (1.386 km). Construction started in June 1974 (Jiřice – Humpolec) and June 1976 (Humpolec – Krasoňov); the earlier date is recorded. Opened at half profile on 22 November 1979 and at full profile on 8 November 1980.

Opened8 km
  1. Jun 1974Construction start
  2. Nov 22, 1979Opened
––––
Krasoňov – Pávov

Dates and length from the cs.wikipedia section table (chainage km 92.7–111.98); no ŘSD leaflet covers this section.

Opened19 km
  1. Jun 1976Construction start
  2. Nov 8, 1980Opened
––––
Pávov – Řehořov

Dates and length from the cs.wikipedia section table (chainage km 111.98–127.28); no ŘSD leaflet covers this section.

Opened15 km
  1. 1976Construction start
  2. Nov 22, 1979Opened
––––
Řehořov – Velké Meziříčí-západ

Dates and length from the cs.wikipedia section table (chainage km 127.28–140.996); no ŘSD leaflet covers this section. Length is the sum of Řehořov – Měřín (7.174 km, opened 28 October 1976) and Měřín – Velké Meziříčí-západ (6.542 km, opened December 1976).

Opened14 km
  1. Jul 1972Construction start
  2. Dec 1976Opened
––––
Velké Meziříčí-západ – Velké Meziříčí-východ

Dates and length from the cs.wikipedia section table (chainage km 140.996–148.526); no ŘSD leaflet covers this section. The table ends this section at km 148.526; the Velké Meziříčí-východ interchange carries exit number 146, so the drawn line follows chainage rather than the interchange.

Opened8 km
  1. Jul 1972Construction start
  2. Nov 28, 1978Opened
––––
Velké Meziříčí-východ – Velká Bíteš

Dates and length from the cs.wikipedia section table (chainage km 148.526–162.774); no ŘSD leaflet covers this section. Length is the sum of two table rows: to Lhotka (5.066 km, opened May 1975) and Lhotka – Velká Bíteš (9.182 km, opened December 1975).

Opened14 km
  1. Jun 1971Construction start
  2. Dec 1975Opened
––––
Velká Bíteš – Kývalka

Dates and length from the cs.wikipedia section table (chainage km 162.774–182.281); no ŘSD leaflet covers this section.

Opened20 km
  1. Apr 1969Construction start
  2. Nov 3, 1973Opened
––––
Kývalka – Brno-západ

Dates and length from the cs.wikipedia section table (chainage km 182.281–190.474); no ŘSD leaflet covers this section.

Opened8 km
  1. Apr 1969Construction start
  2. Sep 6, 1972Opened
––––
Brno-západ – Brno-centrum

Dates and length from the cs.wikipedia section table (chainage km 190.474–194.221); no ŘSD leaflet covers this section.

Opened4 km
  1. Jul 1973Construction start
  2. Oct 28, 1976Opened
––––
Brno-centrum – Brno-jih

Dates and length from the cs.wikipedia section table (chainage km 194.221–196.674); no ŘSD leaflet covers this section. Stavba 01191.C rebuilt this stretch, about 1.4 km, and the road returned to full operation on 7 April 2025; the rebuild is not a separate lot.

Opened2 km
  1. Jul 1973Construction start
  2. Oct 4, 1978Opened
––––
Brno-jih – Brno-východ

Dates and length from the cs.wikipedia section table (chainage km 196.674–203.449); no ŘSD leaflet covers this section. Stavba 01191.A rebuilds the Brno-jih interchange at its western end; works began on 9 October 2025 and are not a separate lot.

Opened7 km
  1. Apr 1979Construction start
  2. Sep 9, 1983Opened
––––
Brno-východ – Holubice

Dates and length from the cs.wikipedia section table (chainage km 203.449–211.034); no ŘSD leaflet covers this section.

Opened8 km
  1. Apr 1979Construction start
  2. Dec 1982Opened
––––
Holubice – Tučapy

Dates and length from the cs.wikipedia section table (chainage km 211.034–219.999); no ŘSD leaflet covers this section. Built as part of the planned D47 branch; ŘSD says this stretch between Rousínov and Vyškov was built as D47 and later became D1.

Opened9 km
  1. Dec 1984Construction start
  2. Nov 11, 1988Opened
––––
Tučapy – Vyškov

Dates and length from the cs.wikipedia section table (chainage km 219.999–229.675); no ŘSD leaflet covers this section. Built as part of the planned D47 branch, like Holubice – Tučapy.

Opened10 km
  1. May 1989Construction start
  2. Jul 30, 1992Opened
––––
Vyškov – Vrchoslavice

Dates and length from the cs.wikipedia section table (chainage km 229.429–247.004). Stavby 0133 Vyškov – Mořice (16.084 km, started April 2002) and 0134.1/I Mořice – Vrchoslavice (1.491 km, started December 2004) opened together on 24 October 2005, so they are one lot; the length is their sum.

Opened18 km
  1. Apr 2002Construction start
  2. Oct 24, 2005Opened
––––
Vrchoslavice – Kojetín

Dates and length from the cs.wikipedia section table (chainage km 247.004–253.629). Stavba 0134.1/II.

Opened7 km
  1. May 24, 2007Construction start
  2. Sep 17, 2009Opened
––––
Kojetín – Kroměříž-západ

Dates and length from the cs.wikipedia section table (chainage km 253.629–257.629). Stavba 0134.2.

Opened4 km
  1. May 12, 2006Construction start
  2. Sep 23, 2008Opened
––––
Kroměříž-západ – Kroměříž-východ

Dates and length from the cs.wikipedia section table (chainage km 257.629–260.629). Stavba 0134.3, the Kroměříž bypass. Opened at half profile in November 2007 and at full profile on 15 August 2008.

Opened3 km
  1. Feb 21, 2005Construction start
  2. Nov 2007Opened
––––
Kroměříž-východ – Hulín

Dates and length from the cs.wikipedia section table (chainage km 260.629–265.429). Part of stavba 0135, which started on 12 May 2008 for both this lot and Hulín – Říkovice.

Opened5 km
  1. May 12, 2008Construction start
  2. Dec 3, 2010Opened
––––
Hulín – Říkovice

Dates and length from the cs.wikipedia section table (chainage km 265.429–271.929). Part of stavba 0135; the ŘSD leaflet for 0136 gives 07/2011 as its opening.

Opened7 km
  1. May 12, 2008Construction start
  2. Jul 11, 2011Opened
––––
Říkovice – Přerov

ŘSD stavba 0136. The leaflet gives the length as 10 100 m (its own chainage km 75.300–85.400). The tender was announced in December 2020 and drew five bids. The contract was signed on 6 December 2022 and the works began on 20 December 2022. By agreement with the contractor, with an acceleration bonus paid, the contractual opening date was brought forward by 91 days to 19 December 2025; a public open day was held on 21 September 2025.

Opened10 km
  1. Dec 6, 2022Tender awarded
  2. Dec 20, 2022Construction start
  3. Dec 19, 2025Opened
  • Estimated Kč6.8BExcluding VAT ("Předpokládaná cena stavby"), price year not stated.
  • European UnionCo-financed from the Cohesion Fund under Programme Doprava 2021–2027 (OPD3).
  • StrabagBuilder
  • DoprastavBuilder
  • IDSBuilder
Contract value Kč6.9B
Přerov – Lipník nad Bečvou

ŘSD stavba 0137, opened on 12 December 2019. The leaflet says the opening slipped by several months because of optical cable relocations at 25 places, far more than documented, and a longer abutment on one bridge. The tender was announced in July 2014.

Opened14 km
  1. Jul 14, 2015Construction start
  2. Dec 12, 2019Opened
––
  • Skanska a.s.Builder
  • Sdružení D 0137 (Dopravoprojekt Brno a.s., HBH Projekt spol. s r.o., SUDOP PRAHA a.s.)Designer
Contract value Kč2.7B
Lipník nad Bečvou – Bělotín

ŘSD stavba 4704. Opening month, length, price and contractors are from the ŘSD D47 brochure; construction start and exact opening day are from the cs.wikipedia section table unless the brochure gives the day (chainage km 296.341–311.718). Six-lane section. The brochure gives 15 387 m; the wiki chainage (km 296.341–311.718) gives 15.377 km.

Opened15 km
  1. Nov 26, 2004Construction start
  2. Nov 25, 2008Opened
––
  • Sdružení D 4704Builder
Contract value Kč7B
Bělotín – Hladké Životice

ŘSD stavba 4705. Opening month, length, price and contractors are from the ŘSD D47 brochure; construction start and exact opening day are from the cs.wikipedia section table unless the brochure gives the day (chainage km 311.718–329.815). Opened at half profile on 25 November 2009 and at full profile on 22 October 2010.

Opened18 km
  1. May 23, 2006Construction start
  2. Nov 25, 2009Opened
––
  • Inžinierske stavby a.s.Builder
  • COLAS CZ, a.s.Builder
Contract value Kč3.6B
Hladké Životice – Bílovec

ŘSD stavba 4706. Opening month, length, price and contractors are from the ŘSD D47 brochure; construction start and exact opening day are from the cs.wikipedia section table unless the brochure gives the day (chainage km 329.815–341.496).

Opened12 km
  1. Apr 6, 2006Construction start
  2. Nov 25, 2009Opened
––
  • SKANSKA DS a.s.Builder
Contract value Kč2.8B
Bílovec – Ostrava-Rudná

ŘSD stavba 4707. Opening month, length, price and contractors are from the ŘSD D47 brochure; construction start and exact opening day are from the cs.wikipedia section table unless the brochure gives the day (chainage km 341.496–353.173). Carries the Klimkovice tunnel (1,080 m), the only tunnel on the whole route.

Opened12 km
  1. Mar 25, 2005Construction start
  2. May 6, 2008Opened
––
  • SKANSKA DS a.s.Builder
  • STRABAG a.s.Builder
  • Subterra a.s.Builder
  • Metrostav a.s.Builder
Contract value Kč6B
Ostrava-Rudná – Hrušov

ŘSD stavba 4708. Opening month, length, price and contractors are from the ŘSD D47 brochure; construction start and exact opening day are from the cs.wikipedia section table unless the brochure gives the day (chainage km 353.351–361.891). Opened ahead of schedule on 2 December 2007.

Opened9 km
  1. Oct 16, 2003Construction start
  2. Dec 2, 2007Opened
––
  • ODS-Dopravní stavby Ostrava, a.s.Builder
  • Stavby silnic a železnic, a.s.Builder
  • OKD, Doprava, akciová společnostBuilder
Contract value Kč5.9B
Hrušov – Vrbice

ŘSD stavba 47091/1. Opening month, length, price and contractors are from the ŘSD D47 brochure; construction start and exact opening day are from the cs.wikipedia section table unless the brochure gives the day (chainage km 361.891–366.351). Opened ahead of schedule on 2 December 2007.

Opened4 km
  1. May 19, 2004Construction start
  2. Dec 2, 2007Opened
––
  • STRABAGBuilder
  • ODS-Dopravní stavby OstravaBuilder
  • Alpine MayrederBuilder
Contract value Kč2.6B
Vrbice – Bohumín

ŘSD stavba 47091/2. Opening month, length, price and contractors are from the ŘSD D47 brochure; construction start and exact opening day are from the cs.wikipedia section table unless the brochure gives the day (chainage km 366.351–370.551). Opened ahead of schedule on 2 December 2007.

Opened4 km
  1. Oct 1, 2004Construction start
  2. Dec 2, 2007Opened
––
  • Stavby silnic a železnicBuilder
  • Skanska DSBuilder
  • Pražské silniční a vodohospodářské stavbyBuilder
Contract value Kč3.1B
Bohumín – Polish border

ŘSD stavba 47092. Opening month, length, price and contractors are from the ŘSD D47 brochure; construction start and exact opening day are from the cs.wikipedia section table unless the brochure gives the day (chainage km 370.551–376.498). Opening to passenger cars on 30 November 2012 was agreed with the Polish side and followed the late completion of a problem bridge; it was coordinated with the opening of Poland's A1.

Opened6 km
  1. Apr 6, 2008Construction start
  2. Nov 30, 2012Opened
––
  • ODS-Dopravní stavby OstravaBuilder
  • Skanska DSBuilder
  • ALPINE stavební spol. CZBuilder
  • OHL ŽSBuilder
Contract value Kč2.7B

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • European Union10 km
    1 section
    • Co-financed from the Cohesion Fund under Programme Doprava 2021–2027 (OPD3).

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. Wikipedia (cs): Dálnice D1, Přehled úseků and Modernizace v úseku Mirošovice–Kývalkaread Oct 5, 2026
  2. ŘSD: Informační leták, D1 stavba 0136 Říkovice – Přerov (12/2025, uvedeno do provozu)read Oct 5, 2026
  3. ŘSD: Informační leták, D1 stavba 0137 Přerov – Lipník nad Bečvou (12/2019, uvedeno do provozu)read Oct 5, 2026
  4. ŘSD: Dálnice D47 Lipník nad Bečvou – Bohumín – státní hranice (brožura RSD_D47_2013, per-section prices, contractors and opening dates)read Oct 5, 2026
  5. ŘSD: Informační leták, D1 01191.C Brno-centrum – Brno-jih (04/2025, full operation on 7 April 2025)read Oct 5, 2026
  6. ŘSD: Informační leták, D1 01191.A MÚK Brno-jih (stav k 04/2026, construction started 9 October 2025)read Oct 5, 2026