A11 Zagreb – Velika Gorica – Lekenik – Sisak

Motorway from the A3 at the Jakuševec interchange in Zagreb past Velika Gorica to Sisak, about 41 km, operated by HAC. It opened in four sections: Velika Gorica jug – Buševec in 2009, Buševec – Lekenik in April 2015, Jakuševec – Velika Gorica jug in November 2015 and Lekenik – Sisak on 22 October 2024. Works began in 2006. Kuna amounts are given in the lot notes only.

Total length
42 km
Open today
42 km
Sections
4
Cost on record
€41.219M
1 of 4 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of A11 Zagreb – Velika Gorica – Lekenik – Sisak: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Jakuševec – Velika Gorica jug

Connects the A3 at the Jakuševec interchange to Velika Gorica jug. The Croatian Wikipedia gives 10.9 km, 4 interchanges, 2 viaducts and no toll; the English Wikipedia gives 11 km and a total cost of 1.645 billion kuna (HRK), and says completion was repeatedly delayed by changes of legislation, land acquisition and funding. The mapped motorway measures about 8.9 km because it starts at the northern end of the mapped carriageways, short of the A3 connection.

Opened11 km
  1. Nov 3, 2015Opened
––––
Velika Gorica jug – Buševec

The first section of the A11, 9 km, with 6 bridges, 4 flyovers, 2 wildlife crossings, a viaduct and an underpass. The English Wikipedia reports a total cost of 657 million kuna (HRK) and says the contract for the works from Velika Gorica jug towards Hrašće Turopoljsko, announced in April 2006 at 202 million kuna (HRK) excluding VAT with completion planned for 15 June 2007, went to a joint venture of Viadukt, Hidroelektra, Konstruktor and Strabag. The Mraclin toll plaza is on the section.

Opened9 km
  1. Apr 5, 2006Construction start
  2. May 9, 2009Opened
––
  • ViaduktBuilder
  • HidroelektraBuilder
  • KonstruktorBuilder
  • StrabagBuilder
–
Buševec – Lekenik

The English Wikipedia says works began in April 2010 with completion first announced for 2011, and gives the works contract as 645 million kuna (HRK) including VAT; it also reports a total cost of 700 million kuna (HRK) excluding VAT. The Croatian Wikipedia counts 20 structures (2 bridges, a viaduct, an ecoduct, 6 overpasses and 8 culverts) and the Lekenik interchange and toll plaza; the Pešćenica rest area was planned with the section.

Opened11 km
  1. Apr 2010Construction start
  2. Apr 22, 2015Opened
––
  • KonstruktorBuilder
  • HidroelektraBuilder
  • Osijek KoteksBuilder
–
Lekenik – Sisak

The last section of the A11, ending at the Sisak interchange, with six overpass crossings and two bridges. The contract was signed in February 2022 with a business association of COLAS Hrvatska and Geotehnika for EUR 37.4 million; the 2021 procurement was valued at EUR 40 million, and HAC says it spent EUR 42 million on the section. Supervision was valued at EUR 500,000 excluding VAT. Works were hard because of marshy ground. The press and the HAC 2024 business report give 10.9 km, one report 11 km. The Sisak access road and Odra bridge are separate HAC contracts and are not in this lot. The English Wikipedia still shows the route as ending at Lekenik.

Opened11 km
  1. Feb 2022Tender awarded
  2. Oct 22, 2024Opened
–
  • OtherFinanced by HAC from its own funds, without additional borrowing.
  • COLAS Hrvatska d.d.Builder
  • GEOTEHNIKA d.o.o.Builder
Contract value €37.4M

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • Other11 km
    1 section
    • Financed by HAC from its own funds, without additional borrowing.

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. Wikipedia (hr): Autocesta A11 (opening dates 2009 and 2015, section lengths, start of works 5 April 2006)read Oct 5, 2026
  2. Wikipedia (en): A11 (Croatia) (kuna costs, contractors, 2010 start of Buševec – Lekenik; stale on the Sisak section)read Oct 5, 2026
  3. Sisak.info: Nakon 18 godina završena je autocesta A11 (22 October 2024; Lekenik – Sisak, COLAS Hrvatska and Geotehnika, EUR 37.4M contract signed February 2022)read Oct 5, 2026
  4. Sisak-Moslavina County: Svečano puštena u promet dionica Lekenik – Sisak (22 October 2024; 10.9 km, HAC own funds EUR 42M)read Oct 5, 2026
  5. HAC d.o.o.: Izvješće o poslovanju za 2024 (Lekenik – Sisak, 10.9 km, opened October 2024)read Oct 5, 2026
  6. OpenStreetMap: relation 144820, Autocesta A11 (ref A11)read Oct 5, 2026
  7. OpenStreetMap contributors: route geometry (ODbL)read Oct 5, 2026