← All projects
Railways
Madrid–Valladolid high-speed railway
The standard-gauge high-speed line from Madrid to Valladolid via Segovia.
- Total length
- 179 km
- Open today
- 179 km
- Sections
- 1
Category
Railways
Status
Opened
Under construction
Tendered
Planned
Loading map data…
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Madrid–Valladolid high-speed line ADIF reports 178.5 km for the Madrid–Valladolid line. The OSM geometry follows one track between Madrid-Chamartín and Valladolid-Campo Grande and measures about 181.6 km. | Opened | 179 km |
| – | – | – | – |
Sources
- Informe de Sostenibilidad y Gobierno Corporativo 2013read Oct 11, 2026
- Revista del Ministerio de Transportes, n.º 708 (noviembre de 2020)read Oct 12, 2026
- OpenStreetMap: Madrid–Valladolid high-speed line, relation 4777557read Oct 11, 2026