Belgrade – Zrenjanin – Novi Sad motorway (A6)

A 105.4 km motorway from Belgrade (Ovča) through Zrenjanin to Novi Sad, in two sections: Belgrade (Ovča) – Zrenjanin, 67.66 km, and Zrenjanin – Novi Sad, 37.74 km, the last 5.5 km of which is an expressway from the toll gate before the Kać interchange to the Novi Sad East interchange. The Ministry of Construction, Transport and Infrastructure lists China Shandong International Economic and Technical Cooperation Group as contractor under a framework commercial agreement of 10 November 2023, and reports that preparatory works are under way at about 5% physical progress. Only the Belgrade – Zrenjanin section is modelled. The 37.74 km Zrenjanin – Novi Sad section is not drawn: OpenStreetMap maps only about 15 km of it as a rough outline, so it is not recorded as a lot. The ministry gives an estimated investment value of EUR 1 596.35 million for the project.

Total length
68 km
Open today
0 km
Sections
1
Cost for the project as a whole
€1.6Bwhole programmeestimatedEstimated investment value (Procenjena vrednost) stated by the ministry for the project as a whole; price year not stated.
Loading map data…

Sections

Sections of Belgrade – Zrenjanin – Novi Sad motorway (A6): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Belgrade (Ovča) – Zrenjanin

The ministry reports that preparatory works are under way at about 5% physical progress; the status is under construction because the ministry reports physical progress, but main construction has not been reported as started, so no construction start is recorded. Length is the ministry's figure. The OpenStreetMap alignment is a rough outline (A6, highway=construction, marked fixme) of 67.36 km and is drawn from Ovča to its western end south-west of Zrenjanin.

Under construction68 km
  1. Nov 10, 2023Tender awarded
–
  • National budgetThe ministry names the republic budget and a domestic bank credit as funding sources for the whole route.
  • China Shandong International Economic and Technical Cooperation GroupBuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • National budget68 km
    1 section
    • The ministry names the republic budget and a domestic bank credit as funding sources for the whole route.

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Sources

  1. Ministry of Construction, Transport and Infrastructure: Izgradnja autoputa Beograd – Zrenjanin – Novi Sad (sections, contractor, framework agreement of 10.11.2023, preparatory works)read Oct 9, 2026
  2. OpenStreetMap contributors: A6 highway=construction ways, Belgrade – Zrenjanin (ODbL)read Oct 9, 2026