Iverak – Lajkovac expressway

An 18.2 km expressway from the A2 Miloš Veliki at Lajkovac to Iverak, east of Valjevo, built by China Shandong International under a commercial contract of 10 June 2020. It opened in stages: about 500 m on 5 May 2023, 11.9 km to the Divci interchange on 23 December 2023 and the rest on 2 February 2025. Lots are split at the Divci interchange. No cost is recorded: the ministry gives an estimated investment of EUR 278 million for the project, which is not a contract value or outturn.

Total length
18 km
Open today
18 km
Sections
2
Loading map data…

Sections

Sections of Iverak – Lajkovac expressway: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Lajkovac – Divci

Connects to the A2 Miloš Veliki at Lajkovac. The ministry gives 11.9 km from the Lajkovac interchange to the Divci interchange. The drawn centreline measures 11.86 km from the Lajkovac junction; the cut is placed inside the mapped Divci interchange.

Opened12 km
  1. Jun 10, 2020Tender awarded
  2. Dec 23, 2023Opened
––
  • China Shandong International Economic and Technical Cooperation GroupBuilder
–
Divci – Iverak

The ministry gives no separate length for this section. Length measured from OpenStreetMap geometry. The drawn route ends at the mapped Iverak junction, so the two lots total 17.66 km against the ministry's 18.2 km for the whole route.

Opened6 km
  1. Jun 10, 2020Tender awarded
  2. Feb 2, 2025Opened
––
  • China Shandong International Economic and Technical Cooperation GroupBuilder
–

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Related projects

Sources

  1. Ministry of Construction, Transport and Infrastructure: Izgradnja brze saobraćajnice Iverak – Lajkovac (status, stages and commercial contract of 10.06.2020)read Oct 5, 2026
  2. OpenStreetMap contributors: trunk ways of the Iverak – Lajkovac expressway (ODbL)read Oct 5, 2026