Iverak – Lajkovac expressway
An 18.2 km expressway from the A2 Miloš Veliki at Lajkovac to Iverak, east of Valjevo, built by China Shandong International under a commercial contract of 10 June 2020. It opened in stages: about 500 m on 5 May 2023, 11.9 km to the Divci interchange on 23 December 2023 and the rest on 2 February 2025. Lots are split at the Divci interchange. No cost is recorded: the ministry gives an estimated investment of EUR 278 million for the project, which is not a contract value or outturn.
- Total length
- 18 km
- Open today
- 18 km
- Sections
- 2
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Lajkovac – Divci Connects to the A2 Miloš Veliki at Lajkovac. The ministry gives 11.9 km from the Lajkovac interchange to the Divci interchange. The drawn centreline measures 11.86 km from the Lajkovac junction; the cut is placed inside the mapped Divci interchange. | Opened | 12 km |
| – | – |
| – |
| Divci – Iverak The ministry gives no separate length for this section. Length measured from OpenStreetMap geometry. The drawn route ends at the mapped Iverak junction, so the two lots total 17.66 km against the ministry's 18.2 km for the whole route. | Opened | 6 km |
| – | – |
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Related projects
- HighwaysBelgrade – Zrenjanin – Novi Sad motorway (A6)Same contractor: China Shandong International Economic and Technical Cooperation Group
- HighwaysDanube Corridor (Požarevac – Veliko Gradište – Golubac)Same contractor: China Shandong International Economic and Technical Cooperation Group
- HighwaysA1 Niš – Preševo (Corridor X south)Same country and category
- HighwaysA2 Miloš Veliki Motorway (Belgrade – Požega)Same country and category
- HighwaysA4 Niš – Dimitrovgrad (E80)Same country and category
- HighwaysA5 Morava Corridor (Pojate – Preljina)Same country and category