Highways

A6 Europe Motorway

Approximately 63 km from the Serbian border at Kalotina to Sofia, on European route E80 and Pan-European Corridor X. It was called the Kalotina motorway until a government decision of 27 December 2018 renamed it and added the Sofia Northern Speed Tangent, opened in April 2016, as its eastern end. Dragoman–Slivnitsa was built by GBS-Infrastructure and opened in November 2020; Kalotina–Dragoman went to the Strabag BPA consortium under a contract signed in November 2018 and opened in October 2023. The last section, Slivnitsa – Sofia Ring Road, opened on 14 September 2025.

Total length
65 km
Open today
65 km
Sections
4
Cost on record
€423.706M
4 of 4 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of A6 Europe Motorway: status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Kalotina – Dragoman

Contract durations converted from days: 852 days total, 122 days design. The contract deadline was January 2022; the section opened to traffic in October 2023 with Act 16 still pending. The builder is the Strabag BPA consortium of Strabag EAD, Strabag Sp. z o.o. (Poland) and Bitumina GmbH-Bulgaria.

Opened15 km
  1. Nov 15, 2018Tender awarded
  2. Feb 2020Construction start
  3. Oct 2023Opened
–
  • European UnionConnecting Europe Facility
  • National budget
  • Strabag BPA (JV)Builder
4 mo design · 28 mo total · Contract value лв137.492M
Dragoman – Slivnitsa

Contract durations converted from days: 910 days total, 180 days design, 730 days works. The contract deadline was May 2021, per the road agency (API).

Opened17 km
  1. Dec 2018Tender awarded
  2. May 2019Construction start
  3. Nov 2020Opened
–
  • European UnionCohesion Fund through OP Transport and Transport Infrastructure 2014–2020, project BG16M1OP001-2.001-0005 (km 15+500 to 48+903). Added after construction began.
  • National budgetState budget, which paid for construction at signing (2018)
  • GBS-InfrastructureBuilder
6 mo design · 24 mo execution · 30 mo total · Contract value лв97.8M
Slivnitsa – Sofia

Agency extent km 32+447 to km 48+903, given by the ministry as 16.5 km. Bulgarian Wikipedia gives 16.16 km, to km 48+611.93 where the Northern Speed Tangent begins. Construction-only contract of 660 days with DZZD Evropa-2022 (GBS Infrastructure, Glavbolgarstroy International, Obonato Build). Works began on km 39+600 to 45+300, the only stretch with land acquired and a building permit.

Opened17 km
  1. Dec 22, 2021Tender awarded
  2. May 12, 2023Construction start
  3. Sep 14, 2025Opened
–
  • European UnionCohesion Fund through OP Transport and Transport Infrastructure 2014–2020, project BG16M1OP001-2.001-0005 (km 15+500 to 48+903). Moved to the Transport Connectivity 2021–2027 programme after delays.
  • National budget
  • Evropa-2022 (JV)Builder
22 mo total · Contract value лв222.466M
Sofia Northern Speed Tangent

Agency length 16.54 km (km 0+000 to 16+540), repeated as 16.5 km at the full opening. Bulgarian Wikipedia gives 15.1 km, after the direct link to the eastern arc of the Ring Road was dropped. Part of the A6 since the government decision of 27 December 2018. The builder is the HPVS-SST consortium of Hidrostroy, Patni Stroezhi Veliko Tarnovo, Patinzhenerinzhstroy, Patstroy Burgas and Vodstroy 98.

Opened17 km
  1. Feb 17, 2014Tender awarded
  2. Feb 18, 2015Construction start
  3. Apr 28, 2016Opened
–
  • European UnionEuropean Regional Development Fund through OP Regional Development 2007–2013, lot 70
  • National budget
  • HPVS-SST (JV)Builder
18 mo total · Contract value лв150M

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Funding

  • European Union65 km
    4 sections
    • Connecting Europe Facility
    • Cohesion Fund through OP Transport and Transport Infrastructure 2014–2020, project BG16M1OP001-2.001-0005 (km 15+500 to 48+903). Added after construction began.
    • Cohesion Fund through OP Transport and Transport Infrastructure 2014–2020, project BG16M1OP001-2.001-0005 (km 15+500 to 48+903). Moved to the Transport Connectivity 2021–2027 programme after delays.
    • European Regional Development Fund through OP Regional Development 2007–2013, lot 70
  • National budget65 km
    4 sections
    • State budget, which paid for construction at signing (2018)

A section that lists two sources counts its full length under each: the data records which sources paid, not what share each one carried.

Related projects

Corridors

The designations this project is recorded under. Both schemes are kept: the Pan-European corridors are how these projects were described when they were planned, and TEN-T is what EU money is allocated on today.

  • Pan-European Corridor XPan-European

Sources

  1. Wikipedia: Europe motorway
  2. 24 часа: Подписаха договора за изграждането на път между „Калотина“ и Драгоман (2018-11-15)read Sep 25, 2026
  3. Mediapool.bg: Подписани са договорите за скоростния път до Калотина (2018-11-15)read Sep 25, 2026
  4. Mediapool.bg: "ГБС Инфраструктурно строителство" ще строи 17 км от новата магистрала "Европа" (2018-12-28)read Sep 25, 2026
  5. Mediapool.bg: Започна строежът на магистралния участък от ГКПП "Калотина" до Драгоман (2020-02-13)read Sep 25, 2026
  6. Mediapool.bg: Първите 17 км от магистрала "Европа" между Драгоман и Сливница са готови (2020-11-10)read Sep 25, 2026
  7. Mediapool.bg: Магистралата между Калотина и Драгоман най-после е готова (2023-10-11)read Sep 25, 2026
  8. gradat.bg: Отворена е за движение магистрала „Европа“ между Калотина и Драгоман (2023-10-16)read Sep 25, 2026
  9. TED 8911-2021 (Agentsiya Patna infrastruktura): Bulgaria-Sofia: Motorway construction works, modification of contract RD-33-17/21.12.2018, I-8 Kalotina – p.v. Hrabarsko km 15+500 – 32+447.20 (2021-01-11)read Oct 1, 2026
  10. Уикипедия: Европа (автомагистрала)read Oct 2, 2026
  11. МРРБ: На 12 май започва изграждането на последния участък от АМ „Европа“ между Сливница и София (2023-05-11)read Oct 2, 2026 · archived copy
  12. БТА: Цялата магистрала "Европа" ще бъде пусната в неделя, съобщи регионалният министър Иван Иванов в парламента (2025-09-10)read Oct 2, 2026
  13. Economic.bg: От София до Сърбия: Цялата магистрала „Европа“ вече е открита (2025-09-14)read Oct 2, 2026
  14. Уикипедия: Северна скоростна тангентаread Oct 2, 2026
  15. Строител: Започва проектирането и строителството на Северната скоростна тангента (2014-02-17)read Oct 2, 2026 · archived copy
  16. АПИ: Започва строителството на Северната скоростна тангента (2015-02-18)read Oct 2, 2026 · archived copy
  17. Infrastructure.bg: Пуснаха движението по 13-километров участък от Северната скоростна тангента (2015-12-30)read Oct 2, 2026 · archived copy
  18. АПИ: Изцяло е пусната за движение Северната скоростна тангента (2016-04-28)read Oct 2, 2026 · archived copy
  19. OpenStreetMap contributors (geometry, ODbL)