D4 motorway (Praha – Příbram – Písek)

Czechia's D4 runs south-west from Jíloviště, where it meets I/4 from Prague, to Nová Hospoda at the I/20 near Písek, about 75 km. The state built the sections from Jíloviště (Jíloviště – Varadov, opened 1971) to Skalka by 1989 and added Skalka – II/118 in October 2017. Háje – Mirotice (32 km of new construction and widening) was built under the first Czech PPP, the Via Salis concession: Via Salis s.r.o. (formerly DIVia D4, Vinci and Meridiam in equal shares) finances and operates it, Eurovia CS builds it, and the state pays availability payments. The winning bid was 16.55 billion CZK discounted to 1 January 2020 and 31.95 billion CZK nominal to 2049 (Zdopravy.cz); these are payments over the concession, not a construction cost, so no cost is recorded for those lots. The section opened on 17 December 2024. Via Salis also operates 16 km of D4 and I/20 that were already built. Praha – Jíloviště (9 km, I/4) is not a motorway and is not drawn. Dates of the older sections are years from the cs.wikipedia table.

Total length
76 km
Open today
76 km
Sections
18
Cost on record
€26.279M
1 of 18 sections carry a comparable figure

Restated into EUR at 2025 prices.

Loading map data…

Sections

Sections of D4 motorway (Praha – Příbram – Písek): status, length, dates, cost, funding and contractors
SectionsStatusLengthTimelineCostFundingContractorsContract terms
Jíloviště – Varadov

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Cut between the Jíloviště (exit 9) and Řitka (exit 14) junctions, proportional to this section and the Řitka bypass; Varadov is not a mapped junction. The table's two lengths sum to 6.2 km, against about 5.0 km between the two junctions; the sourced length is kept.

Opened2 km
  1. 1969Construction start
  2. 1971Opened
––––
Řitka bypass

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Ends at the Řitka junction (exit 14); the cut with Jíloviště – Varadov is proportional (see that lot). Drawn length about 3.4 km against 4.2 km in the table; the sourced length is kept.

Opened4 km
  1. 1971Construction start
  2. 1978Opened
––––
Řitka – Mníšek pod Brdy

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Runs between the Řitka (exit 14) and Mníšek pod Brdy (exit 18) junctions.

Opened3 km
  1. 1978Construction start
  2. 1982Opened
––––
Mníšek pod Brdy – Kytín

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Runs between the Mníšek pod Brdy (exit 18) and Kytín (exit 21) junctions. Drawn length about 4.0 km against 3.1 km here (3.2 km in the article text); the sourced length is kept.

Opened3 km
  1. 1976Construction start
  2. 1980Opened
––––
Kytín – Voznice

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Runs between the Kytín (exit 21) and Voznice (exit 24) junctions. Drawn length about 2.7 km against 3.5 km in the table; the sourced length is kept.

Opened4 km
  1. 1975Construction start
  2. 1981Opened
––––
Voznice – Kodetka and Dobříš relocation

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Merges Voznice – Kodetka (2.1 km, started 1980) and the Dobříš relocation (3.2 km, started 1982), which the table gives the same opening year; the length is the sum. Starts at the Voznice junction (exit 24). The end is proportional between the Dobříš-sever (exit 27) and Dobříš-jih (exit 32) junctions, using the table lengths of the relocation and Dobříš – Obořiště. The article's prose gives 1983 for the Dobříš – Voznice link; the table's year is recorded.

Opened5 km
  1. 1980Construction start
  2. 1986Opened
––––
Dobříš – Obořiště

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Ends at the Dobříš-jih junction (exit 32), which the table lists in this row; the start is the proportional cut described under the Voznice – Dobříš lot.

Opened3 km
  1. 1978Construction start
  2. 1983Opened
––––
Obořiště relocation

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Cut proportional to the table lengths between the Dobříš-jih (exit 32) and Skalka (exit 41) junctions; there is no mapped junction at Obořiště or Dlouhá Lhota.

Opened4 km
  1. 1977Construction start
  2. 1980Opened
––––
Dlouhá Lhota relocation

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Cut proportional to the table lengths between the Dobříš-jih (exit 32) and Skalka (exit 41) junctions; there is no mapped junction at Obořiště or Dlouhá Lhota.

Opened3 km
  1. 1979Construction start
  2. 1981Opened
––––
Dlouhá Lhota – Skalka

Dates (years) and length from the cs.wikipedia section table; no ŘSD leaflet covers this section. Ends at the Skalka junction (exit 41); the start is the proportional cut between the Dobříš-jih and Skalka junctions.

Opened2 km
  1. 1986Construction start
  2. 1989Opened
––––
Skalka – II/118 (Dubenec bypass)

ŘSD stavba S7, 4788 m, category R 22.5/80. Four-lane motorway that replaced the two-lane I/4 and bypasses Dubenec; the existing carriageway is reused as one of the two. Leaflet: 'Stavba byla slavnostně zahájena 1. dubna 2015'. Valbek is the leaflet's 'Zpracovatel DSP' (permit design). Starts at the OSM Skalka junction (leaflet km 41.115); this and the later cuts scale the official lengths over the drawn line.

Opened5 km
  1. Apr 1, 2015Construction start
  2. Oct 4, 2017Opened
––
  • Skanska a.s.Builder
  • Valbek spol. s r.o.Designer
Contract value Kč417.49M
II/118 (Háje) – Milín

ŘSD stavba S8, 5460 m, part of the Via Salis PPP concession (signed 15 February 2021, construction from June 2021). Opened 17 December 2024. The state pays the concessionaire availability payments over the concession; they are not a construction cost and are not recorded as one. Eurovia CS is named as builder for the project as a whole. Widens the former I/4 by two lanes into a motorway; includes the Milín junction. Via Salis lists it as section 2, Háje – Milín.

Opened5 km
  1. Feb 15, 2021Tender awarded
  2. Jun 2021Construction start
  3. Dec 17, 2024Opened
––
  • Via Salis s.r.o. (formerly DIVia D4 s.r.o.)Concessionaire
  • Eurovia CSBuilder
–
Milín – Lety

ŘSD stavba S9, 11600 m, part of the Via Salis PPP concession (signed 15 February 2021, construction from June 2021). Opened 17 December 2024. The state pays the concessionaire availability payments over the concession; they are not a construction cost and are not recorded as one. Eurovia CS is named as builder for the project as a whole. Includes the Chraštice and Zalužany bypass and the Těchařovice junction. Via Salis: 'Výstavba zcela nového úseku dálnice D4'.

Opened12 km
  1. Feb 15, 2021Tender awarded
  2. Jun 2021Construction start
  3. Dec 17, 2024Opened
––
  • Via Salis s.r.o. (formerly DIVia D4 s.r.o.)Concessionaire
  • Eurovia CSBuilder
–
Lety – Čimelice

ŘSD stavba C11, 2590 m, part of the Via Salis PPP concession (signed 15 February 2021, construction from June 2021). Opened 17 December 2024. The state pays the concessionaire availability payments over the concession; they are not a construction cost and are not recorded as one. Eurovia CS is named as builder for the project as a whole. Widens the former I/4 into a motorway and adds the Lety junction with I/19.

Opened3 km
  1. Feb 15, 2021Tender awarded
  2. Jun 2021Construction start
  3. Dec 17, 2024Opened
––
  • Via Salis s.r.o. (formerly DIVia D4 s.r.o.)Concessionaire
  • Eurovia CSBuilder
–
Čimelice – Mirotice

ŘSD stavba C12, 8460 m, part of the Via Salis PPP concession (signed 15 February 2021, construction from June 2021). Opened 17 December 2024. The state pays the concessionaire availability payments over the concession; they are not a construction cost and are not recorded as one. Eurovia CS is named as builder for the project as a whole. Čimelice bypass, the longest bridge of the new motorway, a monolithic bridge over the Skalice river (Via Salis) and two opposed rest areas at Krsice. Via Salis: 'Výstavba zcela nového úseku dálnice D4'.

Opened8 km
  1. Feb 15, 2021Tender awarded
  2. Jun 2021Construction start
  3. Dec 17, 2024Opened
––
  • Via Salis s.r.o. (formerly DIVia D4 s.r.o.)Concessionaire
  • Eurovia CSBuilder
–
Mirotice bypass (half profile, widened 2024)

ŘSD stavba C13 'Mirotice, rozšíření', 3645 m. The bypass, the left half of the future motorway (category S 11.5/80), was built in 1984–1985 and has been open at half profile since 1985. The Via Salis PPP added the second half (construction from June 2021, category D 25.5/100) and it opened as a motorway on 17 December 2024. That widening is recorded here and not as a second lot, because the kilometres are the same. Concessionaire from the leaflet; concession payments are availability payments, not a construction cost.

Opened4 km
  1. 1984Construction start
  2. 1985Opened
––
  • Via Salis s.r.o. (formerly DIVia D4 s.r.o.)Concessionaire
–
Mirotice – Třebkov

Length, start year and opening from the cs.wikipedia section table and text: ceremonial opening on 16 September 2010, open to the public the next day. Category R 22.5/100. Cut at a distance proportional to the sourced lengths, not at a mapped junction.

Opened6 km
  1. 2008Construction start
  2. Sep 17, 2010Opened
––––
Nová Hospoda junction with I/20

About 800 m with the grade-separated junction with I/20; the motorway ends here and continues as the four-lane I/20. Start month from the section table, opening date from the article text ('ke zprovoznění úseku došlo 19. listopadu 2007').

Opened0.8 km
  1. Sep 2005Construction start
  2. Nov 19, 2007Opened
––––

Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.

Related projects

Sources

  1. Wikipedia (cs): Dálnice D4, Přehled úseků and PPPread Oct 10, 2026
  2. ŘSD leaflet: D4 Skalka–křižovatka II/118 (stavba S7)read Oct 10, 2026
  3. ŘSD leaflet: D4 Háje–Milín (stavba S8)read Oct 10, 2026
  4. ŘSD leaflet: D4 Milín–Lety (stavba S9)read Oct 10, 2026
  5. ŘSD leaflet: D4 Lety–Čimelice (stavba C11)read Oct 10, 2026
  6. ŘSD leaflet: D4 Čimelice–Mirotice (stavba C12)read Oct 10, 2026
  7. ŘSD leaflet: D4 Mirotice, rozšíření (stavba C13)read Oct 10, 2026
  8. Via Salis: 32 km nové a 16 km modernizované dálnice, sections 2 to 6read Oct 10, 2026
  9. Zdopravy.cz: Podepsáno, dálnici D4 dostaví francouzské sdružení (15 Feb 2021)read Oct 10, 2026
  10. Zdopravy.cz: První dálniční projekt PPP má vítěze. Dálnici D4 postaví Eurovia (9 Dec 2020)read Oct 10, 2026
  11. OpenStreetMap: relation 295545, D4 (network CZ:national)read Oct 10, 2026
  12. OpenStreetMap contributors: route geometry (ODbL)read Oct 10, 2026