Montana – Botevgrad Expressway (I-1 / E79)
Planned 97.8 km expressway on road I-1 (E79) linking Montana, Vratsa, Mezdra and Botevgrad, continuing the Vidin – Montana motorway towards the A2 Hemus. It is built as new road and as widening of the existing I-1 to a Г20 cross-section with a 120 km/h design speed. The Montana bypass opened on 29 December 2015, Lot 2 (Mezdra – Lyutidol) in July 2025, and 7.5 km of Lot 1 in April 2023. Montana – Vratsa, the Vratsa bypass and Vratsa – Mezdra have no construction contractor. The existing I-1 carries traffic on the unbuilt stretches and is not modelled as a separate lot.
- Total length
- 99 km
- Open today
- 33 km
- Sections
- 8
- Cost on record
- €185.274M
- 1 of 8 sections carry a comparable figure
Restated into EUR at 2025 prices.
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Montana bypass Road I-1 (E79) from km 102+060 to km 114+512.20. The Bulgarian Wikipedia table lists the works at 46,572,618 leva including VAT, with indexation, as at 15 April 2025; it is not an award value and is not recorded as a cost here. | Opened | 12 km |
| – | – |
| – |
| Montana – Vratsa Road I-1 from km 111+305 to km 140+008. A procedure for a preliminary design with geological surveys was opened on 22 December 2023 and the design contract was signed with Трансгео ЕООД on 1 August 2024. As of 1 September 2024 no construction contractor procedure had started. The existing I-1 carries traffic on this stretch. | Planned | 29 km | – | – | – |
| – |
| Vratsa bypass Doubling of the existing Vratsa bypass to the Г20 cross-section, about 15 km. The design contract was signed on 18 February 2025 with Обединение „ИКюИнфра“. As of 1 September 2024 no procedure to choose a contractor for the doubling had started. | Planned | 15 km | – | – | – |
| – |
| Vratsa – Mezdra To be rehabilitated within the existing alignment, which already has the required cross-section. As of 1 September 2024 no contractor procedure had started. A temporary connection between Mezdra and Vratsa was reported in July 2025. | Planned | 9 km | – | – | – | – | – |
| Mezdra – Lyutidol (Lot 2) Road I-1 (E79) from km 161+367 to km 174+800, including the Lyutidol bypass, for which the API page lists two tunnels of 490 m and 340 m; whether they were built is not confirmed. Contract duration converted from days: 1096 days (180 design, 916 construction). News.bg reported on 2 July 2025 that the lot would be officially put into operation the next day; the exact day is not confirmed by a second source, so only the month is recorded. A further contract signed on 10 October 2024 covers landslide stabilisation on the lot, and OpenStreetMap still maps part of the Lyutidol bypass as under construction. The API page gave 266,975,906.88 leva including VAT; the Bulgarian Wikipedia table lists 475,920,000 leva, which is not recorded. | Opened | 13 km |
| – | – |
| 6 mo design · 30 mo execution · 36 mo total · Contract value лв266.976M |
| Lyutidol – Novachene (Lot 1, western part) Western part of Lot 1 (km 174+800 to km 194+122, 19.322 km), contract РД-33-12 of 18 October 2019 for 159,599,935.27 leva including VAT, 1096 days (180 design, 916 construction). The contract value covers the whole lot and is not split here; the Bulgarian Wikipedia table lists 218,876,687 leva with indexation. Length measured from OpenStreetMap geometry. A 4 km stretch between km 180 and km 184, with the Трудовец overpass, had an Act 15 signed in January 2026 and awaited a use permit. Balkanec.bg reports Lot 1 as 98.5% built, excluding landslide stabilisation, and the whole road finished by mid-2027 (a press forecast). | Under construction | 11 km |
| – | – |
| – |
| Novachene – Skravena (Lot 1, opened part) 7.5 km of new road between Novachene and Skravena, with the Novachene interchange, three bridges over the Bebresh, Rudarka and Kalnitsa rivers and two overpasses, opened on 13 April 2023. Balkanec.bg gives 7.26 km from Novachene to Skravena. Part of Lot 1 under contract РД-33-12; no construction start date is published. | Opened | 8 km |
| – | – |
| – |
| Skravena – Botevgrad interchange (Lot 1, eastern part) Works from km 192+140 to km 194+122, including the Botevgrad interchange and a new road section of about 1 km. News.bg reported on 21 July 2026, citing the roads agency, that the interchange was built and Act 15 was signed, with the use permit still to be issued. BTA reported on 5 October 2026 that the minister expected the use permit within the day; no source read states that it was issued or that traffic is running, so the lot is kept as under construction. Landslide works on six newly registered landslides continue on Lot 1. Part of Lot 1 under contract РД-33-12. | Under construction | 2 km |
| – | – |
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Related projects
- HighwaysA1 Trakia MotorwaySame contractor: PSI, Trace Group Hold
- HighwaysA2 Hemus MotorwaySame contractor: Patstroy-92, Trace Group Hold
- RailwaysSofia Metro Line M3 (Gorna Banya – Levski)Same contractor: Trace Group Hold
- HighwaysA3 Transylvania Motorway (Brașov–Cluj–Borș)Same contractor: Váhostav
- HighwaysA7 Motorway (Moldavia Motorway)Same contractor: Trace Group Hold
- RailwaysBucharest Metro Line M4 (Gara de Nord 2 – Străulești)Same contractor: Trace Group Hold
Corridors
The designations this project is recorded under. Both schemes are kept: the Pan-European corridors are how these projects were described when they were planned, and TEN-T is what EU money is allocated on today.
- Pan-European Corridor IVPan-European
Sources
- Wikipedia (bg): Скоростен път „Монтана – Ботевград“read Oct 5, 2026
- Агенция „Пътна инфраструктура“: Мездра – Ботевград от км 174+800 до км 194+122, лот 1read Oct 5, 2026 · archived copy
- Агенция „Пътна инфраструктура“: Мездра – Ботевград от км 161+367 до км 174+800, лот 2read Oct 5, 2026 · archived copy
- News.bg: Пускат движението в участъка между Ботевград и Мездра в посока Врацаread Oct 5, 2026
- Пътстрой-92: Готови са 7,5 км новопостроено трасе от скоростен път „Мездра-Ботевград“ Лот 1read Oct 5, 2026
- Balkanec.bg: Пътен възел „Ботевград“ е готов и очаква официално пускане в експлоатацияread Oct 5, 2026
- БТА: Пътят Мездра - Ботевград ще бъде завършен в рамките на година, съобщи регионалният министърread Oct 5, 2026
- OpenStreetMap contributors: road I-1 (E79) between Montana and Botevgrad (ODbL)read Oct 5, 2026
- News.bg: Завърши изграждането на пътен възел „Ботевград“ по пътя Мездра – Ботевградread Oct 5, 2026