Subotica – Horgoš – Hungarian Border Railway
Reconstruction of the Serbian section of the single-track Szeged–Subotica line, Serbian line 201, from Subotica to the Hungarian border near Horgoš. Works began in June 2021 and passenger service resumed on 28 November 2023, together with the rebuilt Hungarian section. Passenger trains had been suspended on the Horgoš–Subotica section since 2015. The Hungarian section (MÁV line 136, 15 km Szeged–Röszke) is not part of this project.
- Total length
- 28 km
- Open today
- 28 km
- Sections
- 1
Sections
| Sections | Status | Length | Timeline | Cost | Funding | Contractors | Contract terms |
|---|---|---|---|---|---|---|---|
| Subotica – Horgoš – Hungarian border Length measured from OpenStreetMap geometry; no published length for the Serbian section was found. Works began in June 2021 with demolition of the worn infrastructure. Track reached the border in March 2022 and the overhead line was finished by April 2022. RZD International won the international tender announced in early 2021; no contract value or cost is recorded. The geometry starts at Subotica station, a short distance south of where the Belgrade–Subotica project's geometry ends. | Opened | 28 km |
| – | – |
| – |
Contractor roles are as recorded in the award. Only builders count toward the delivery rankings.
Related projects
- RailwaysBelgrade – Novi Sad – Subotica High-Speed RailwaySame contractor: RZD International
- RailwaysBelgrade Metro Line 1, Phase 1Same country and category
- RailwaysCorridor X Railway Modernisation (Belgrade – Niš)Same country and category
- RailwaysNiš – Dimitrovgrad Railway ModernisationSame country and category
- RailwaysNiš – Brestovac Railway ReconstructionSame country and category
- RailwaysZemun Polje – Nikola Tesla Airport – National Stadium railwaySame country and category
Sources
- Wikipedia (hu): Szeged–Szabadka-vasútvonalread Oct 5, 2026
- OpenStreetMap contributors: route geometry, line Суботица – Хоргош – ДГ 201 (ODbL)read Oct 5, 2026